How to Log Equipment Usage and Run Times in SimplySub

Learn how to track equipment usage in SimplySub using timers, quick entry, and completed hours. Record operators, run times, and equipment hour meters.

Updated 2026-11-21

Overview

SimplySub makes it easy to track equipment usage, operating hours, and the employees responsible for running equipment on your jobsites. Whether your crews are operating excavators, skid steers, loaders, or other equipment, you can record usage directly against the jobs where the equipment is being used.

Accurate equipment logging helps you understand how much equipment time is being spent on each job, maintain equipment usage records, and capture information that can support billing and invoicing.

SimplySub offers three ways to log equipment usage:

  • Equipment Timer: Start and stop a timer to track equipment usage as it happens.
  • Quick Entry: Enter multiple equipment usage records at once, ideal for recording activity at the end of the day.
  • Log Completed Hours: Use the original equipment logging method to record completed equipment usage.

All three methods are accessible from the job record. Equipment logging works on mobile phones, tablets, laptops, and desktop computers.

How to Access Equipment Logging

  1. Log in to your SimplySub account.
  2. Open the main Jobs board.
  3. Use the job search to locate the job where the equipment is being used.
  4. Open the job record.
  5. Select Log Equipment.
  6. Choose the equipment logging method you want to use.

Because you're logging equipment directly from a job, SimplySub associates the equipment usage with that job automatically.

Method 1: Track Equipment Usage with the Equipment Timer

The Equipment Timer is designed for real-time tracking. Instead of remembering how long a piece of equipment was used, operators can start a timer when they begin working and stop it when the equipment is no longer in use.

How to Start an Equipment Timer

  1. Open the job where the equipment will be used.
  2. Select Log Equipment.
  3. Choose Start Equipment Timer.
  4. Select the piece of equipment you will be operating.
  5. Optionally, enter notes describing the work being performed, such as excavation, grading, or site preparation.
  6. Select Start Timer.

The equipment timer begins tracking usage time. You can continue working while the timer runs.

How to Stop an Equipment Timer

  1. Return to the running equipment timer.
  2. Select Stop.
  3. Enter the equipment's ending hour meter reading.
  4. If you do not track equipment hour meters, enter 0.
  5. Select Stop Timer to finish recording the equipment usage.

SimplySub records the equipment usage against the associated job.

How Ending Hour Meters Work

When stopping an equipment timer, you can enter the equipment's ending hour meter reading.

If your business tracks equipment operating hours, this value updates the hour meter associated with the equipment record.

Keeping equipment hour meters current can also support equipment maintenance tracking. For example, SimplySub can use accumulated equipment hours to identify upcoming service intervals and generate maintenance reminders when applicable.

Note: If your business does not track equipment hour meters, you can enter 0 when stopping a timer.

How to Run Multiple Equipment Timers at Once

SimplySub supports multiple active equipment timers, allowing you to track several pieces of equipment simultaneously.

This can be useful when a crew member is responsible for recording usage across multiple machines working on the same jobsite.

Start Another Equipment Timer

  1. With an equipment timer already running, return to the equipment timer interface.
  2. Select Start Another Equipment Timer.
  3. Choose a different piece of equipment.
  4. Optionally, enter notes describing its activity.
  5. Select Start.

Both equipment timers will continue running.

The interface displays the number of active equipment timers. For example, when two timers are active, the button displays 2 Equipment Running.

Stop an Individual Equipment Timer

  1. Select the indicator showing your running equipment timers.
  2. Choose the specific piece of equipment you want to stop.
  3. Enter its ending hour meter reading, or 0 if you do not track meters.
  4. Select Stop Timer.

Only the selected equipment timer is stopped. Any other active equipment timers continue running until you stop them individually.

Method 2: Log Multiple Equipment Records Using Quick Entry

Quick Entry is designed for recording equipment usage after the work has already been completed.

For example, a crew leader may want to record the equipment operated by several employees at the end of the workday rather than starting and stopping individual timers throughout the day.

Quick Entry allows multiple equipment usage records to be entered together, making it convenient for daily equipment reporting.

How to Create Equipment Usage Records with Quick Entry

  1. Open the job where the equipment was used.
  2. Select Log Equipment.
  3. Choose Quick Entry.
  4. Select the piece of equipment that was used.
  5. Choose the Operator. This can be yourself or another employee.
  6. Enter the equipment's Start Time and End Time.
  7. Enter the equipment hour meter reading, if applicable.
  8. Optionally, add notes describing the work performed.
  9. Continue adding equipment usage entries as needed.

Quick Entry is especially useful when several pieces of equipment were operated during the same shift.

Duplicate an Equipment Usage Entry

If multiple pieces of equipment were operated during similar time periods, you can use the duplicate option to save time.

  1. Complete an equipment usage entry.
  2. Select Duplicate.
  3. SimplySub creates another entry using the same information.
  4. Change the equipment selection as needed.
  5. Update the operator or other details if they are different.

This is helpful when multiple machines were operating during the same hours, because you don't need to reenter every field.

Add a Blank Equipment Usage Entry

If you need to enter a completely different equipment record, select Add Another.

SimplySub adds a new blank entry, allowing you to select another piece of equipment and enter its usage details.

You can continue adding additional equipment records as needed.

Using Quick Entry on Mobile Devices

Quick Entry is designed to work on both mobile and desktop devices.

On desktop screens, equipment records are displayed in a horizontal layout to make entering multiple records convenient.

On mobile phones, the interface automatically adjusts to a vertical layout. Each equipment usage entry appears in its own separate section, making the fields easier to read and complete on a smaller screen.

You can use Add Another to continue adding records. The demonstrated Quick Entry workflow does not impose a limit on the number of entries you can add at one time.

Method 3: Log Equipment Using Completed Hours

In addition to Equipment Timer and Quick Entry, SimplySub continues to support its original equipment logging method, called Log Completed Hours.

This method allows you to enter equipment usage details and build a list of completed equipment records before saving them together.

How to Log Completed Equipment Hours

  1. Open the applicable job record.
  2. Select Log Equipment.
  3. Choose Log Completed Hours.
  4. Select the equipment that was used.
  5. Select the employee who operated the equipment.
  6. Enter the applicable usage times using the available time controls.
  7. Select Apply to confirm the time selection.
  8. Click Add Usage to add the equipment record to your list.
  9. Repeat the process for any additional equipment usage records.
  10. When finished, select Save All.

SimplySub saves the completed equipment usage records to the associated job.

This original method remains available alongside the newer Timer and Quick Entry options.

How to Review Logged Equipment Usage

Once equipment usage has been recorded, the information is available for review within the job's equipment records.

From the job record, open the equipment section to review the recorded usage.

Equipment logging records can include:

  • Equipment: The machine or piece of equipment used.
  • Usage Date: The date the equipment was operated.
  • Operating Hours: The total recorded equipment usage time.
  • Operator: The employee associated with the usage record.
  • Notes: Additional information about the work performed.
  • Job Association: The jobsite where the equipment usage was recorded.

This provides office staff and field supervisors with a record of how equipment was used on individual jobs.

These records can also help support equipment-related billing and invoicing by documenting the time equipment was used.

Which Equipment Logging Method Should You Use?

Each logging method serves a different workflow.

  • Equipment Timer: Best for operators who want to track equipment usage in real time as work happens.
  • Quick Entry: Best for crew leaders or supervisors who want to enter multiple equipment usage records after the workday is complete.
  • Log Completed Hours: Best for teams that prefer the original equipment logging workflow and want to add completed usage records before saving them together.

All three methods allow you to record equipment activity against a job in SimplySub.

Helpful Tips

  • Log equipment directly from the job. This automatically associates the usage record with the correct jobsite.
  • Use timers for real-time tracking. Start the timer when equipment operation begins and stop it when the equipment is no longer being used.
  • Track multiple machines simultaneously. You can run more than one equipment timer and stop each independently.
  • Keep equipment hour meters updated. Enter ending meter readings when stopping timers to support equipment maintenance tracking.
  • Use Quick Entry for end-of-day reporting. Crew leaders can record multiple equipment runs without creating each one separately throughout the day.
  • Duplicate similar usage entries. When multiple machines worked during the same period, duplicate an existing Quick Entry record and adjust the applicable details.
  • Add notes when useful. Describe the work performed so office staff can better understand how equipment time was spent.

Frequently Asked Questions

Can I track equipment usage from my phone?

Yes. SimplySub supports equipment logging on mobile phones, tablets, laptops, and desktop computers. The Quick Entry interface automatically adjusts its layout for smaller screens.

Can I run more than one equipment timer at the same time?

Yes. SimplySub supports multiple active equipment timers. You can start timers for different pieces of equipment and stop each one individually.

Do I have to enter an ending hour meter reading?

If you do not track equipment hour meters, you can enter 0 when stopping an equipment timer. If you enter an actual ending hour meter reading, SimplySub updates the equipment's meter value.

Can I enter equipment usage after the work has been completed?

Yes. Use Quick Entry to enter equipment usage retroactively. You can specify the equipment, operator, start time, end time, meter reading, and optional notes.

Can I record equipment usage for another employee?

Yes. Quick Entry allows you to select yourself or another employee as the equipment operator. The Log Completed Hours method also allows you to select the employee associated with each record.