Overview
SimplySub's Image Annotation feature allows you to draw directly on jobsite photos, highlight important details, add notes, and visually communicate information to your crew, supervisors, and customers.
Whether you're identifying an area that needs repair, marking equipment locations, documenting property damage, or pointing out specific items on a jobsite, image annotation makes it easy to communicate exactly what needs attention.
With SimplySub Image Annotation, you can:
- Draw freehand markings directly on photos.
- Add arrows to point out important details.
- Draw rectangles and circles around areas of interest.
- Add text labels and descriptions to images.
- Customize annotation colors, line thicknesses, and text sizes.
- Move and reposition annotations before saving.
- Save annotated photos as new images without replacing the originals.
- Use annotated images in photo reports, daily logs, and other SimplySub workflows.
- Annotate images from desktop computers, tablets, and smartphones.
Step 1: Open a Job and Locate Your Photo
Image annotation is available through the Files area of a job record.
To get started:
- Log in to your SimplySub workspace.
- From your Jobs Board, select the job containing the image you want to annotate.
- Open the job's Files area.
- Locate the photo you want to mark up.
- Click the photo's Actions menu.
- Select Annotate Image.
SimplySub will open the selected photo in the image annotation editor, where you can add drawings, shapes, arrows, and text.
Step 2: Draw on an Image Using the Pen Tool
The Pen tool allows you to create freehand drawings directly on your photo.
This is useful when you want to circle an irregularly shaped object, highlight a work area, or draw attention to something that doesn't fit neatly inside a rectangle or circle.
To use the Pen tool:
- Select the Pen tool in the annotation editor.
- Choose the color you want to use.
- Draw directly on the image using your mouse, finger, or touchscreen.
- Adjust the line thickness to make your markings more visible.
For example, if you're documenting a demolition project, you might draw around the portion of a structure that needs to be removed or protected during the work.
Change Pen Colors and Line Thickness
You can customize the appearance of your drawings to make important details stand out.
The editor supports different colors, including red, yellow, green, blue, and white.
You can also increase or decrease line thickness depending on the size of the image and the details you're highlighting.
Tip: Choose a color that contrasts with the background of your photo. Increasing line thickness can also make annotations easier to see.
Step 3: Add Arrows to Highlight Specific Items
Arrows are useful when you need to identify a specific object, location, or area within a photograph.
For example, you might use an arrow to point toward an electrical junction box, damaged component, or equipment connection.
To add an arrow:
- Select the Arrow tool.
- Draw an arrow toward the item you want to identify.
- Adjust the arrow's color as needed.
- Increase the line thickness if you want the arrow to stand out more clearly.
Arrows can help eliminate confusion when multiple objects are visible in the same photo.
Step 4: Highlight Areas Using Rectangles and Circles
SimplySub includes shape tools that allow you to create consistent rectangles and circles instead of drawing them by hand.
Draw Rectangles and Boxes
Rectangles are useful for marking larger areas, equipment, materials, or specific sections of a jobsite.
To draw a rectangle:
- Select the Rectangle or box tool.
- Draw the rectangle around the area you want to highlight.
- Adjust the border color and line thickness.
- Optionally, choose a fill color for the inside of the rectangle.
For example, you could draw a rectangle around a section of equipment tracks or an area of a jobsite that requires additional attention.
Draw Circles
The Circle tool allows you to highlight an object or area using a consistent circular shape.
To draw a circle:
- Select the Circle tool.
- Draw a circle around the item you want to identify.
- Choose your preferred border color.
- Adjust the line thickness.
- Optionally, apply a fill color to the circle.
Both rectangles and circles support colored outlines and filled shapes, helping you draw attention to important portions of a photograph.
Step 5: Add Text Notes to Your Image
Text annotations allow you to place written instructions, descriptions, or labels directly on a photo.
This is useful when a picture alone doesn't fully explain the work that needs to be completed.
For example, you might add a note that says:
"Unsuitable soil needs to be removed."
To add text:
- Select the Text annotation tool.
- Click or tap the area of the image where you want to place your note.
- Enter your text.
- Adjust the text size to improve readability.
- Choose a text color that is easy to see against the photo.
- Move the text into its final position if needed.
For example, white text may be easier to read over a dark area of a photograph, while darker text may work better over a light background.
Step 6: Move and Adjust Your Annotations
You can reposition annotations while working in the image editor.
If a drawing, arrow, shape, or text label isn't in the correct location, you don't need to start over.
To reposition an annotation:
- Select the annotation you want to adjust.
- Move it to the desired location on the photo.
- Make any additional changes to its appearance as needed.
For example, if you accidentally circle an HVAC unit when you intended to highlight a nearby light fixture, you can move the annotation to the correct location before saving.
You can combine multiple annotation types on the same image to create a more detailed visual explanation.
Step 7: Save Your Annotated Image
Once you've finished adding your drawings, arrows, shapes, and notes, you can save the annotated version of your photo.
- Review your annotations and confirm everything is positioned correctly.
- Click Save Annotated Copy.
- Allow SimplySub to create the new annotated image.
- Return to the job's image library to view the saved result.
Important: Saving an annotated copy creates a new image rather than replacing the original photo.
This means you can retain the original photograph while also keeping a separate marked-up version for documentation and communication.
The annotated image becomes part of the job's standard image library in SimplySub.
Step 8: Use Annotated Photos Throughout SimplySub
Once an annotated image has been saved, it can be used like other images associated with the job.
Annotated images are available for use in SimplySub features such as:
- Job Files: Keep annotated photos alongside other job-related files and images.
- Photo Reports: Include marked-up images in photographic job documentation.
- Daily Logs: Use annotated photos to help document work performed or conditions observed.
- Customer Communication: Share annotated images to help explain jobsite conditions, concerns, or required work.
Because the annotated copy becomes part of the job's image library, you don't need to recreate your markings for each use.
Using Image Annotation on Mobile Devices
Image annotation is available on desktop computers, tablets, and smartphones.
Employees working in the field can open a job's Files area, select an image, and use the annotation tools directly from their mobile device.
Mobile annotation is especially useful for:
- Highlighting safety concerns discovered during a site visit.
- Documenting damaged equipment or materials.
- Identifying areas requiring repair or additional work.
- Marking locations for demolition, excavation, or installation.
- Adding notes before sharing photos with supervisors or customers.
The same annotation tools demonstrated on desktop are available for mobile use.
Helpful Tips
- Use arrows for precision: Point directly at the item you want someone to notice.
- Use rectangles for larger areas: Highlight sections of a jobsite, equipment, or material storage areas.
- Use circles for individual objects: Draw attention to specific components or problem areas.
- Add text for context: Explain what needs to be repaired, removed, inspected, or protected.
- Adjust line thickness: Thicker lines may be easier to see when viewing photos on smaller screens.
- Choose contrasting colors: Use colors that stand out from the image background.
- Reposition before saving: Review the location of your annotations so they point to the correct items.
- Keep the original: Use Save Annotated Copy to preserve an unmarked version of the photograph.
Frequently Asked Questions
Does annotating an image replace the original photo?
No. When you select Save Annotated Copy, SimplySub creates a new image containing your annotations. The original photograph remains available.
Can I annotate images from my phone?
Yes. SimplySub supports image annotation on smartphones, tablets, and desktop computers.
What types of annotations can I add?
You can add freehand drawings, arrows, rectangles, circles, and text. You can also customize colors, line thicknesses, fill colors for shapes, and text sizes.
Can I move annotations after placing them?
Yes. You can select and reposition annotations within the editor before saving your annotated image.
Where are annotated images saved?
Annotated copies are saved as new images within the associated job's image library in SimplySub.
Can annotated images be included in reports?
Yes. Saved annotated images are available for use in SimplySub photo reports and daily logs, as well as other workflows that use job-related images.