Overview
SimplySub's GPS Tracking feature allows construction and trade businesses to monitor the locations of their vehicles, trailers, and equipment directly within SimplySub.
Whether you're managing pickup trucks, dump trucks, trailers, skid steers, excavators, or other heavy equipment, GPS tracking helps you understand where your assets are located and how they relate to your active jobsites.
SimplySub displays tracked assets on an interactive map, including available location information, vehicle speed, and the time of the most recent GPS update.
The system also supports alerts when an asset moves after business hours or during an unexpected time frame, helping your business identify activity that may require attention.
How SimplySub GPS Tracking Works
SimplySub GPS Tracking uses physical tracking devices installed in or attached to the assets you want to monitor.
Each tracked asset requires its own GPS tracking device.
The general process works as follows:
- A GPS tracker is installed in or on the vehicle, trailer, or equipment you want to monitor.
- The tracker determines the asset's geographic location.
- GPS coordinates are transmitted back to SimplySub.
- SimplySub displays the asset's location on a map.
- You can review the asset's location and other available tracking information.
This allows you to monitor equipment and vehicles from within your SimplySub workspace rather than relying only on manual updates about where assets are located.
What Types of Assets Can Be Tracked?
SimplySub GPS Tracking supports different types of business assets, including:
- Pickup Trucks: Monitor company pickup trucks and other work vehicles.
- Dump Trucks: Track trucks used to transport construction materials.
- Trailers: Monitor the locations of trailers used by your crews.
- Skid Steers: Keep track of compact equipment used across jobsites.
- Bulldozers: Monitor heavy earthmoving equipment.
- Excavators and Mini Excavators: Track equipment assigned to different project locations.
- Other Equipment: Monitor additional assets equipped with compatible GPS tracking devices.
SimplySub supports tracking an unlimited number of assets, with each asset requiring its own tracker.
How to View Tracked Assets on the GPS Map
SimplySub displays GPS-enabled assets on a map so you can review their locations.
To review your tracked assets:
- Open the GPS tracking map within SimplySub.
- Review the available asset markers displayed on the map.
- Locate the vehicle or equipment you want to inspect.
- Select its marker to view additional tracking information.
The map provides a visual overview of your tracked assets and their locations.
This makes it easier to identify which vehicles or pieces of equipment are near a particular jobsite.
How to View an Asset's Location and Speed
Selecting a tracked asset on the map allows you to review information reported by its GPS tracking device.
Available information includes:
- Asset Location: The geographic location reported by the tracker.
- Speed: The reported speed of the vehicle or asset.
- Last Updated: How recently SimplySub received location information from the tracker.
Example: Monitoring a Moving Vehicle
Suppose one of your company's pickup trucks is traveling between jobsites.
When you select that vehicle on the GPS map, SimplySub can display its reported speed, such as 51 miles per hour, along with its location and the time of the most recent update.
This allows you to see where the vehicle was last reported and whether it is moving.
How Often Does GPS Tracking Update?
SimplySub's GPS Tracking feature is designed to receive location updates approximately every 10 seconds.
As GPS data is received, the map can display updated asset locations and information.
You can also review the time of the most recent GPS report to understand how current the displayed information is.
Note: The last-updated information is useful when reviewing an asset's location, especially when the most recent report was not received immediately.
How to View Jobsites on the GPS Map
In addition to tracked assets, SimplySub can display jobsites on the GPS map.
This allows you to see where your equipment and vehicles are located in relation to the projects your company is working on.
Jobsite locations can be represented using map markers and highlighted areas.
View Jobsite Information
- Open the GPS tracking map.
- Locate a jobsite marker or highlighted jobsite area.
- Select the jobsite you want to inspect.
- Review the available job information.
Jobsite details can include:
- Job Identifier: The job number or identifying information.
- Job Address: The location of the project.
- Percentage Complete: The recorded completion percentage for the job.
For example, selecting a jobsite may show that a particular project is 95% complete, along with its address.
How to See Which Assets Are Near a Jobsite
One of the benefits of SimplySub GPS Tracking is the ability to review asset locations alongside your jobsites.
For example, you might want to know whether a particular pickup truck or piece of heavy equipment is currently located at a project.
- Open the GPS tracking map.
- Locate the jobsite you want to review.
- Identify the tracked asset markers displayed at or near that location.
- Select an asset marker to review its location details.
- Select the jobsite marker to review the associated job information.
This provides a convenient way to understand where your company's vehicles and equipment are positioned relative to its active work locations.
How After-Hours Movement Alerts Work
SimplySub GPS Tracking supports alerts when a tracked asset moves after business hours or during an unexpected time frame.
These alerts help draw attention to activity that may require investigation.
For example, an alert may be useful when:
- A company vehicle moves outside normal business hours.
- A trailer is unexpectedly moved from its location.
- Heavy equipment is operated during an unusual time period.
- An asset may have been used without authorization.
- There is concern about possible equipment theft.
When unexpected movement is detected, SimplySub can notify you about the activity.
Important: An after-hours movement alert indicates activity that may need attention. It does not necessarily mean that an asset has been stolen or used improperly.
How GPS Tracking Can Help Your Business
Locate Equipment Across Multiple Jobsites
When your company operates at several locations, the GPS map can help you identify where tracked equipment and vehicles are located.
Review Vehicle Movement
Reported speed and location information can help you understand when a tracked vehicle is moving and where it was most recently reported.
Monitor Assets Outside Business Hours
After-hours movement alerts provide additional visibility into unexpected activity involving company vehicles and equipment.
Compare Asset Locations With Job Locations
Displaying jobsites and GPS-enabled assets on the same map makes it easier to understand where equipment is positioned in relation to your projects.
Keep Asset Information in SimplySub
By displaying GPS tracking information within SimplySub, you can review asset locations alongside your existing job and operational information.
Helpful Tips
- Equip every asset you want to monitor: Each tracked vehicle, trailer, or piece of equipment requires its own GPS tracker.
- Check the last update time: Review when the tracker most recently reported its location before relying on the map position.
- Use jobsite markers: Compare tracked asset locations with your company's job locations.
- Review reported speeds: Select moving vehicles to see their available speed information.
- Pay attention to after-hours alerts: Investigate unexpected movement when necessary.
- Track different asset types: GPS tracking is useful for vehicles, trailers, and heavy equipment.
Frequently Asked Questions
Can I track my company vehicles using SimplySub?
Yes. SimplySub supports GPS tracking for company vehicles, including pickup trucks and other work vehicles equipped with compatible GPS tracking devices.
Can SimplySub track trailers and heavy equipment?
Yes. You can track trailers, skid steers, excavators, bulldozers, and other supported assets using GPS tracking devices.
Do I need a GPS device for each asset?
Yes. Each vehicle or piece of equipment you want to track requires its own GPS tracking device.
How frequently does SimplySub update GPS locations?
The GPS Tracking feature is designed to provide updates approximately every 10 seconds. You can also review the last-reported time for an asset.
Can I see how fast a vehicle is traveling?
Yes. SimplySub displays reported vehicle speed information alongside its GPS location details.
Can I see my equipment and jobsites on the same map?
Yes. SimplySub displays tracked assets and jobsite locations together, helping you understand where vehicles and equipment are located relative to your projects.
Does SimplySub support after-hours movement alerts?
Yes. SimplySub supports alerts when tracked assets move after business hours or during unexpected time periods.
Is there a limit to how many assets I can track?
SimplySub supports an unlimited number of tracked assets. Each asset requires its own GPS tracking device.