How to Enable and Configure Automatic Lunch Breaks

Learn how to enable automatic employee lunch breaks in SimplySub, configure shift requirements, set lunch durations, and review lunch records in timecards.

Updated 2026-11-21

Overview

SimplySub includes an Automatic Lunch Breaks feature that helps businesses manage employee meal breaks without requiring crews to manually enter a separate lunch record for every qualifying shift.

When enabled, SimplySub evaluates employee time punches and automatically generates lunch records based on your company's configured rules.

You can control the minimum shift length required for a lunch break, how long each lunch break should be, and how much time can pass between separate punches before they are treated as unrelated shifts.

Automatically generated lunch records are reflected in employee timecards and punch logs, helping keep time and attendance records organized.

How to Enable Automatic Lunch Breaks

Automatic Lunch Breaks can be enabled from the employee module's administrative settings.

  1. Sign in to your SimplySub account.
  2. Open the main navigation menu and select Admin Settings.
  3. Select Employees and Users.
  4. Click the configuration gear icon to open the employee module settings.
  5. Select Settings for Employees.
  6. Locate the Automatic Lunch Breaks setting.
  7. Turn Automatic Lunch Breaks on.

Once enabled, SimplySub will use the configured lunch break rules when processing employee time punches going forward.

How to Configure Automatic Lunch Break Settings

There are three important settings that determine when and how SimplySub automatically generates lunch records.

1. Minimum Shift Length in Minutes

The Minimum Shift Length in Minutes setting determines how long an employee must be clocked in before SimplySub will automatically apply a lunch break.

This prevents lunch breaks from being applied to shifts that are too short to qualify under your company's policy.

Example: An employee clocks in at 7:00 AM and clocks out at 10:00 AM, working a three-hour shift.

If your configured minimum shift length is greater than three hours, SimplySub will not generate an automatic lunch record for that shift.

Set this value according to the minimum amount of time your company requires an employee to work before an automatic lunch break should be applied.

2. Lunch Break Duration in Minutes

The Lunch Break Duration setting determines the length of the lunch break SimplySub will automatically generate for qualifying shifts.

Common examples include:

  • 30 minutes: A half-hour lunch break.
  • 60 minutes: A one-hour lunch break.

Enter the duration that matches your company's lunch break policy.

3. Maximum Shift Gap in Minutes

The Maximum Shift Gap setting determines how much time can pass between two separate employee punch records before SimplySub considers them unrelated shifts.

This setting helps SimplySub determine whether multiple time punches should be evaluated as a continuation of the same shift.

Example 1: Continuous Shift

  • Employee clocks in at 7:00 AM.
  • Employee clocks out at 11:00 AM.
  • Employee clocks back in at 11:00 AM.
  • Employee clocks out at 3:00 PM.

Because there is no gap between the two punch records, SimplySub can recognize them as a continuation of the same shift when evaluating automatic lunch break eligibility.

Example 2: Separate Shifts

  • Employee clocks in at 7:00 AM.
  • Employee clocks out at 11:00 AM.
  • Employee does not clock back in until 3:00 PM.

In this example, four hours pass between the two punch records.

Depending on your configured maximum shift gap, SimplySub may treat these punch records as separate shifts instead of combining them into one continuous shift.

When punch records are treated as unrelated shifts, SimplySub does not combine them for the purpose of automatically generating a lunch record.

The demonstrated default value for Maximum Shift Gap is 240 minutes (4 hours). You can adjust this setting to match your company's requirements.

How Automatic Lunch Breaks Work

Once Automatic Lunch Breaks is enabled, SimplySub evaluates employee time punches using your configured settings.

The general process works as follows:

  1. An employee clocks in to begin working.
  2. The employee clocks out when their work period ends.
  3. If multiple punch records exist, SimplySub evaluates the gaps between them to determine whether they belong to the same shift.
  4. SimplySub evaluates the applicable shift length against your configured minimum shift requirement.
  5. If the shift qualifies, SimplySub automatically generates a lunch record using your configured lunch duration.
  6. The generated lunch record is reflected in the employee's time and attendance records.

Your crews can continue using their normal time clock workflow while SimplySub handles the automatic lunch record generation.

How to View Automatically Generated Lunch Records

SimplySub displays automatically generated lunch records in employee timecards and punch logs.

  1. Open the employee time and attendance area in SimplySub.
  2. Access the Punch Log or applicable employee timecard.
  3. Locate the employee and work date you want to review.
  4. Review the recorded punches for that shift.
  5. Look for an entry using the Lunch time code.

When SimplySub automatically applies a lunch break, the generated record is identified using the Lunch time code.

If a shift does not meet the configured minimum requirements, an automatic lunch record will not be generated for that shift.

Example: Why an Automatic Lunch Record Might Not Be Generated

Suppose an employee works the following shift:

  • Clock In: 7:00 AM
  • Clock Out: 11:00 AM
  • Total Shift: 4 hours

If your company's minimum shift length requirement is greater than four hours, SimplySub will not automatically generate a lunch break for this shift.

This is expected behavior because the employee did not meet the configured minimum shift length.

Helpful Tips

  • Set an appropriate minimum shift length: Choose a threshold that reflects when employees should qualify for an automatic lunch break.
  • Choose the correct lunch duration: Configure the number of minutes that matches your company's meal break policy.
  • Review maximum shift gaps: This setting determines whether separate punch records can be treated as part of the same shift.
  • Check your timecards: Review employee timecards and punch logs to confirm that automatic lunch records are being generated as expected.
  • Look for the Lunch time code: Automatically generated lunch records are identified using the Lunch time code in the punch log.
  • Configure settings before relying on automation: Make sure your lunch break rules match your company's requirements before enabling automatic processing.

Troubleshooting

An automatic lunch record was not generated

If a lunch record does not appear for an employee's shift, review the following:

  • Automatic Lunch Breaks: Confirm the feature is enabled under Admin Settings, Employees and Users, and Settings for Employees.
  • Minimum Shift Length: Confirm the employee worked long enough to meet the configured minimum shift requirement.
  • Maximum Shift Gap: Check whether separate punch records exceeded the configured gap tolerance and were treated as unrelated shifts.
  • Punch Log: Review the employee's punch records and look for the Lunch time code.

Frequently Asked Questions

Where do I enable Automatic Lunch Breaks?

Navigate to Admin Settings, select Employees and Users, click the configuration gear, and open Settings for Employees. From there, turn on Automatic Lunch Breaks.

Can I choose how long the automatic lunch break lasts?

Yes. You can configure the lunch duration in minutes, such as 30 minutes for a half-hour break or 60 minutes for a one-hour break.

Will SimplySub automatically apply lunch breaks to short shifts?

Only if the shift meets your configured minimum shift length. Shifts that are shorter than the required minimum will not receive an automatic lunch record.

What does Maximum Shift Gap mean?

Maximum Shift Gap determines how much time can pass between separate employee punch records before SimplySub considers them unrelated shifts. The demonstrated default setting is 240 minutes, or four hours.

Where can I see automatic lunch break records?

Automatically generated lunch records appear in employee timecards and punch logs. Look for entries identified with the Lunch time code.