Overview
SimplySub allows you to customize the size of your company logo on estimate and invoice PDF documents.
If your logo appears too small or too large, you can adjust its size using the Logo Size setting in your Financials configuration.
The setting supports precise scaling, allowing you to make your logo smaller, larger, or anywhere in between without having to upload a different logo image.
You can configure the logo size for Estimates and Invoices independently, giving you control over how your branding appears on each document type.
How to Change the Logo Size on Estimates
To adjust your company logo on estimate PDFs, follow these steps:
- Log in to your SimplySub workspace.
- Navigate to Financials Home.
- Click the gear icon to open the Financials settings and customization options.
- Select Estimates.
- Locate the setting labeled Logo Size.
- Change the value to your preferred logo scaling factor.
- Save the updated setting.
The logo size setting controls how large your uploaded company logo appears when an estimate PDF is generated.
For example, entering 2 displays your logo at twice its normal size, while entering 0.5 reduces it to half its normal size.
Understanding Logo Size Values
SimplySub uses a scaling multiplier to determine how large your logo appears on estimate and invoice documents.
Here are some examples:
- 0.5: Half the normal logo size (50%).
- 1.0: Normal logo size (100%).
- 1.5: One and a half times the normal size (150%).
- 1.68: Approximately 68% larger than normal.
- 2.0: Double the normal size (200%).
- 2.5: Two and a half times the normal size (250%).
Maximum Logo Size: The Logo Size setting supports values up to 2.5 times the normal logo size.
Can I Use Decimal Values?
Yes. You aren't limited to whole numbers or increments of 0.5.
For example, you can enter values such as 1.66, 1.67, or 1.68 to fine-tune the appearance of your logo.
This flexibility helps you find the right balance between making your logo prominent and keeping the overall document layout visually balanced.
How to Preview Your Updated Estimate Logo
After changing the logo size, generate a new estimate PDF to see how the adjustment looks.
- Open an existing estimate in SimplySub.
- Click Download PDF.
- Open the generated estimate PDF.
- Review the size and placement of your company logo.
- If the logo appears too large or too small, return to Financials Home > Settings > Estimates using the gear icon.
- Adjust the Logo Size value again.
- Download a new PDF to review the updated result.
You can repeat this process until you find the size that works best for your company's logo.
Example: Fine-Tuning a Logo
Suppose your company logo appears too small at its normal size.
You might initially increase the Logo Size setting from 1.0 to 2.0.
After generating a new PDF, you may find that the logo is now larger than you'd prefer.
Instead of returning to the normal size, you could try 1.68 and generate the PDF again.
Using decimal adjustments allows you to fine-tune the logo until it looks appropriate for your document layout.
How to Change the Logo Size on Invoices
Invoices have their own Logo Size setting, separate from the setting used for estimates.
To update the logo size on invoice PDFs:
- Navigate to Financials Home.
- Click the gear icon to open Financials settings.
- Select Invoices.
- Locate the Logo Size setting.
- Enter your desired scaling value.
- Save the updated setting.
For example, if you configured your estimate logo size to 1.68, you can also enter 1.68 for invoices to maintain a consistent logo size across both document types.
However, you aren't required to use the same setting for estimates and invoices. Each document type can have its own logo size.
How to Preview Your Updated Invoice Logo
After adjusting the invoice Logo Size setting, you can verify the appearance using an invoice PDF.
- Open an existing invoice.
- Click Download PDF.
- Open the generated invoice PDF.
- Review the company logo.
- If necessary, return to the invoice settings and adjust the Logo Size value.
- Generate another PDF to compare the results.
This process lets you evaluate the appearance of your invoices before sending them to customers.
Do Logo Size Changes Affect Previously Sent Documents?
No. Previously generated PDFs that have already been emailed to customers are not retroactively updated.
Changing the Logo Size setting affects the appearance of newly generated documents. It does not modify PDF files that were previously delivered to customers.
For example, if you emailed an invoice last week with a smaller company logo, changing the Logo Size setting today will not change the PDF attachment the customer already received.
To review the updated appearance, generate a new PDF using the adjusted settings.
Helpful Tips
- Start with a moderate adjustment: If your logo is too small, try increasing the multiplier gradually rather than immediately using the maximum value.
- Use decimals for precision: Values such as 1.5 or 1.68 provide more flexibility than whole-number scaling.
- Preview before sending: Download a new estimate or invoice PDF to verify the appearance of your logo.
- Keep branding consistent: Consider using the same logo size for both estimates and invoices.
- Adjust document types separately: Estimates and invoices have independent Logo Size settings.
- Remember previously sent PDFs: Updating the logo size does not change documents that have already been emailed to customers.
Frequently Asked Questions
How do I make my company logo bigger on an estimate?
Open Financials Home, click the gear icon, select Estimates, and increase the Logo Size value. Save the setting and download a new estimate PDF to preview the change.
How do I make my logo bigger on an invoice?
Navigate to Financials Home, open the settings using the gear icon, select Invoices, and increase the Logo Size value. Save your changes and generate a new invoice PDF.
What is the maximum logo size?
The Logo Size setting supports scaling up to 2.5 times the normal logo size.
Can I use different logo sizes for estimates and invoices?
Yes. SimplySub provides separate Logo Size settings for estimates and invoices, so you can configure each document type independently.
Can I enter a value like 1.67 instead of 1.5 or 2.0?
Yes. The Logo Size setting supports decimal values, allowing you to make precise adjustments to your logo's appearance.
Will changing the logo size update invoices I've already emailed?
No. Previously emailed PDF documents are not retroactively changed. The updated setting applies when generating new PDFs.
Need Help?
If you need assistance adjusting the logo size on your estimates or invoices, contact the SimplySub support team for guidance.