Back to Daily Log Templates
Daily Log Template
Free Resource
Updated 2026-08-13

Waterproofing Daily Log Template

Download a waterproofing daily log template to track crews, membrane installation, materials, weather, testing, delays, equipment, and daily jobsite progress.

Document Waterproofing Progress From the Field

A waterproofing daily log gives specialty contractors a consistent way to record labor, membrane installation, substrate preparation, penetrations, drains, sealants, protection board, drainage, equipment, testing, weather, deliveries, delays, and coordination issues for each workday.

This Waterproofing Daily Log Template is designed for commercial waterproofing subcontractors, building-envelope contractors, restoration contractors, specialty coating contractors, project managers, superintendents, foremen, and field supervisors working on below-grade walls, podiums, plaza decks, balconies, terraces, planters, traffic coatings, and related moisture-protection systems.

What Is a Waterproofing Daily Log?

A waterproofing daily log is a field record completed for each day crews perform or support waterproofing work. It captures who was onsite, what areas were released, what preparation and installation occurred, which materials and equipment were used, and what conditions affected production.

For waterproofing contractors, a useful daily record should distinguish open membrane installation from high-detail work. It can show how many square feet of sheet or fluid-applied membrane were installed, how many penetrations or drains were detailed, how much termination or sealant was completed, whether protection board or drainage composite followed the membrane, and whether testing or repairs affected progress.

Important: Record observed conditions while they are current. When substrate defects, moisture, weather, incomplete penetrations, blocked access, backfill activity, testing, or other trades affect the work, document the location, duration, activity affected, direction received, and supporting references without assigning responsibility unless it has been established.

When to Use a Waterproofing Daily Log

  • Tracking daily below-grade waterproofing installation
  • Recording sheet-applied, self-adhered, fluid-applied, cementitious, or coating work
  • Documenting substrate cleaning, grinding, patching, crack treatment, and primer application
  • Tracking penetrations, drains, joints, terminations, transitions, and other detail work
  • Recording protection board, drainage composite, insulation, flashing, and sealants
  • Tracking crew size, labor classifications, regular hours, and overtime
  • Documenting membrane, coating, primer, protection, drainage, and accessory deliveries
  • Tracking lifts, scaffolding, sprayers, pumps, mixers, grinders, vacuums, heaters, and temporary enclosures
  • Recording mockups, flood testing, leak detection, inspections, repairs, and retesting
  • Documenting substrate delays, weather impacts, access restrictions, backfill coordination, and other jobsite constraints

Who Should Use This Template?

This template is suitable for waterproofing subcontractors, building-envelope contractors, restoration contractors, coating contractors, project managers, superintendents, foremen, field supervisors, quality-control staff, and operations teams.

It can be used on commercial buildings, multifamily projects, parking structures, hospitals, schools, hotels, industrial facilities, foundations, retaining walls, podiums, plaza decks, balconies, terraces, planters, pits, and other waterproofing scopes.

What a Waterproofing Daily Log Should Include

Log Section What to Record
Project and Date Project, job number, location, date, report number, foreman, shift, and areas worked.
Weather and Conditions Temperature, precipitation, wind, humidity where relevant, substrate conditions, standing water, and weather impacts.
Crew and Labor Employee or crew, classification, regular hours, overtime, work area, system, and activity performed.
Surface Preparation Cleaning, drying, grinding, patching, crack treatment, void filling, tie-hole treatment, and substrate deficiencies.
Membrane and Coating Work Primer, sheet membrane, self-adhered membrane, fluid-applied membrane, coatings, reinforcement, and installed area.
Details Penetrations, drains, corners, transitions, terminations, joints, tie-ins, and other detailed conditions completed.
Protection and Drainage Protection board, drainage composite, drainage mat, insulation, termination bars, sealants, and flashing installed.
Materials and Deliveries Membranes, primers, coatings, sealants, drainage products, protection materials, quantities, condition, and storage location.
Equipment Lifts, scaffolding, sprayers, mixers, pumps, generators, grinders, vacuums, heaters, and equipment status.
Testing and Inspection Mockups, flood tests, electronic leak detection, visual inspections, results, deficiencies, repairs, and retesting.
Delays and Constraints Substrate not ready, incomplete penetrations, access restrictions, weather, material shortages, equipment downtime, or other-trade interference.
Photos and Follow-Up Photo references, open issues, RFIs, instructions, change events, safety observations, and work planned for the next shift.

How to Use the Template

  1. Enter the project, date, daily log number, foreman, shift, and weather conditions.
  2. Record each worker or crew, classification, regular hours, overtime, work location, system, and activity.
  3. Identify the exact building, area, elevation, level, grid, or location where work occurred.
  4. Record substrate preparation completed and note defects or conditions that affected waterproofing readiness.
  5. Enter installed membrane, coating, protection, drainage, sealant, and detail quantities using consistent units.
  6. Record deliveries, material lot or batch information where required by the project, damaged material, and storage location.
  7. Document equipment used and any downtime that affected production.
  8. Record testing, inspection, deficiencies, repairs, corrective work, and retest status.
  9. Describe delays and constraints factually, including location, duration, crew affected, work affected, and any alternate work performed.
  10. Reference photos, instructions, RFIs, potential change work, safety observations, and planned work for the next day.
Construction example:

A five-person waterproofing crew works on the north foundation wall of a mixed-use project. During the shift, the crew prepares approximately 3,100 square feet of concrete, applies primer, installs 2,850 square feet of sheet membrane, details 12 penetrations, and installs 420 square feet of protection board. Work stops for 1.5 hours at one section because a plumbing penetration has not been completed. A membrane delivery arrives with one damaged roll, which is photographed and segregated. The daily log records labor hours, production, penetration locations, weather, the delayed area, material condition, equipment use, photos, and follow-up required before the next shift.

Best Practices for Waterproofing Daily Logs

  • Complete one log for every day waterproofing crews are onsite.
  • Identify work by area, elevation, level, grid, substrate, or other verifiable location.
  • Record measurable production instead of relying only on broad descriptions such as “installed waterproofing.”
  • Separate surface preparation, membrane installation, detailing, protection, drainage, and testing where useful.
  • Record substrate conditions that affect adhesion, application, sequencing, or acceptance.
  • Track penetrations, drains, joints, corners, transitions, and terminations separately from open membrane runs.
  • Document damaged, missing, rejected, or incorrect material at delivery.
  • Record equipment downtime, weather conditions, and access restrictions when they affect production.
  • Use photos to support substrate conditions, completed work, testing, damage, delays, and repairs.
  • Record facts and observed conditions without assuming contractual responsibility.
Tip: Record both membrane area and detail work. A day with only 700 square feet of membrane installation may still represent strong production if the crew completed numerous drains, penetrations, transitions, and terminations that require substantially more labor than open field work.

Common Waterproofing Daily Log Mistakes

  • Recording labor hours without identifying work locations or activities
  • Using vague descriptions that do not identify the waterproofing system or installed quantity
  • Failing to separate substrate preparation from membrane installation
  • Not recording penetrations, drains, transitions, terminations, or joint details
  • Failing to document substrate defects or incomplete adjacent work
  • Ignoring weather conditions that affect waterproofing or coating work
  • Failing to document damaged membrane, coating, drainage, or protection materials at delivery
  • Recording failed testing without noting the location, repair, and retest status
  • Waiting several days to reconstruct field events from memory
  • Using blame-oriented statements instead of recording observable conditions and direction received

Frequently Asked Questions

What should a waterproofing daily log include?

A waterproofing daily log should include project information, weather, crew hours, work locations, substrate preparation, installed quantities, materials, equipment, testing, delays, safety observations, photos, instructions, and follow-up items.

What waterproofing production should be tracked?

Useful quantities may include membrane square footage, coating area, primer area, protection-board area, drainage-composite area, penetrations, drains, termination footage, transition footage, joint footage, and sealant footage.

Should substrate preparation be recorded separately?

Yes. Cleaning, grinding, patching, crack treatment, void filling, tie-hole treatment, and drying can consume significant labor and may explain why membrane production is lower on a particular day.

How should substrate defects be documented?

Record the exact location, observed condition, approximate extent, whether waterproofing could proceed, direction received, responsible follow-up party if known, and photo or RFI reference.

How should waterproofing delays be recorded?

Record the affected area, start and end time or duration, observable cause, workers and equipment affected, work that could not proceed, alternate work performed, direction received, and supporting references.

Should weather be included?

Yes. Temperature, precipitation, wind, humidity where relevant, standing water, and other environmental conditions can affect substrate readiness, membrane installation, coatings, sealants, testing, and protection work.

How should flood testing or leak detection be documented?

Record the test type, exact location, testing party, start and completion time, result, deficiency locations, repairs performed, retest requirement, and report or photo references.

Should photos be attached to the daily log?

Photos are useful for documenting substrate conditions, membrane installation, penetrations, drains, protection, deliveries, damage, testing, delays, repairs, and completed work. Reference each image to a specific location or log entry.

Build a Reliable Daily Record of Waterproofing Operations

A consistent waterproofing daily log connects crew hours with actual field production while preserving a record of preparation, membranes, details, protection, drainage, testing, materials, equipment, delays, and jobsite conditions. That record gives office and field teams better information for reviewing progress and resolving follow-up items.