Landscaping Estimate Template

Download a landscaping estimate template to calculate labor, plants, soil, mulch, irrigation, hardscape, equipment, subcontractor costs, overhead, and project pricing.

Build Detailed Landscaping Estimates From Takeoff Through Final Price

A landscaping estimate gives contractors a structured way to calculate labor, plant material, soil, mulch, irrigation, drainage, hardscape, equipment, delivery, subcontractor costs, overhead, and profit before work begins. It helps landscape contractors prepare consistent bids, plan procurement, assign crews, and establish a reliable baseline for job costing.

This Landscaping Estimate Template is designed for landscape contractors, irrigation contractors, hardscape installers, landscape maintenance companies, design-build firms, estimators, project managers, and business owners preparing residential, commercial, municipal, multifamily, hospitality, and institutional proposals.

What Is a Landscaping Estimate?

A landscaping estimate is a detailed projection of the labor, materials, equipment, subcontractor, and indirect costs required to complete a landscape project. It may include demolition, site preparation, grading, soil amendments, topsoil, sod, seed, trees, shrubs, perennials, mulch, edging, irrigation, drainage, retaining walls, pavers, fencing, lighting, cleanup, maintenance, and warranty work.

A useful estimate should separate work by area, material type, quantity, installation method, crew, equipment, and phase. Installing container shrubs in prepared beds requires different labor and equipment than planting large-caliper trees, laying sod, building a segmental retaining wall, or trenching an irrigation mainline.

Important: An estimate is an internal pricing document and does not replace a signed proposal, contract, purchase order, or approved change order. Final scope, quantities, exclusions, warranties, taxes, allowances, and payment terms should be confirmed in the executed agreement.

When to Use This Template

  • Estimating residential landscape installation
  • Preparing commercial landscaping bids
  • Pricing planting, sod, seed, mulch, and soil work
  • Estimating irrigation and drainage installation
  • Pricing patios, walkways, edging, and retaining walls
  • Preparing landscape renovation and enhancement proposals
  • Estimating tree replacement and restoration planting
  • Pricing maintenance establishment periods
  • Preparing alternates and value-engineering options
  • Calculating landscape change-order pricing

Who Should Use This Template?

This template is suitable for landscape contractors, irrigation contractors, hardscape contractors, landscape maintenance companies, arborists, nursery installers, grading contractors, design-build firms, estimators, project managers, operations managers, and business owners.

It can be adapted for residential, commercial, multifamily, municipal, public, institutional, hospitality, retail, healthcare, education, recreation, and mixed-use projects.

What a Landscaping Estimate Should Include

Estimate Section Purpose
Project and Bid Details Identifies the customer, project, estimate number, bid date, drawings, specifications, addenda, estimator, and pricing assumptions.
Site Preparation Tracks demolition, clearing, grading, excavation, disposal, soil preparation, erosion control, and access requirements.
Planting Materials Calculates trees, shrubs, perennials, ornamental grasses, groundcover, sod, seed, and specialty plant material.
Soil, Mulch, and Amendments Includes topsoil, compost, planting mix, fertilizer, mulch, gravel, root barriers, and soil conditioners.
Irrigation and Drainage Tracks pipe, valves, heads, dripline, controllers, backflow devices, sleeves, drains, basins, and related installation.
Hardscape and Site Features Includes pavers, edging, retaining walls, steps, curbs, decorative stone, fencing, lighting, and site furnishings.
Labor Calculates layout, demolition, grading, planting, trenching, irrigation, hardscape, cleanup, and supervision hours.
Equipment and Rentals Includes skid steers, mini excavators, trenchers, compactors, loaders, dump trailers, lifts, augers, and delivery equipment.
Subcontractors and Services Accounts for tree care, concrete, electrical, hauling, testing, survey, irrigation startup, and specialty work.
Pricing Summary Calculates direct cost, taxes, allowances, contingency, overhead, profit, gross margin, and final estimated price.

How to Use the Template

  1. Enter the customer, project, estimate number, bid date, drawings, specifications, and addenda.
  2. Separate the project by zone, planting area, irrigation zone, hardscape area, elevation, phase, or cost code.
  3. Measure demolition, grading, planting bed, turf, irrigation, drainage, and hardscape quantities.
  4. Enter plant sizes, container sizes, calipers, quantities, unit costs, delivery, and waste or replacement allowances.
  5. Calculate soil, mulch, aggregate, compost, fertilizer, and amendment quantities by area and depth.
  6. Estimate labor by activity, crew type, production rate, access condition, and installation method.
  7. Add equipment, trucking, disposal, delivery, fuel, mobilization, and rental costs.
  8. Include irrigation startup, testing, cleanup, maintenance periods, warranty, and subcontractor pricing.
  9. Document alternates, allowances, unit prices, assumptions, exclusions, and work by others.
  10. Apply overhead, contingency, taxes, and profit according to company policy, then review the estimate against the bid documents.
Construction example:

A landscape contractor estimates a multifamily project with separate cost codes for demolition, fine grading, topsoil, 48 trees, 620 shrubs, 8,500 square feet of sod, 12,000 square feet of mulch beds, drip irrigation, spray irrigation, drainage improvements, segmental retaining walls, paver walkways, equipment, cleanup, and a 90-day plant-establishment period. Labor is adjusted for restricted access, phased building turnover, and limited material staging.

Best Practices for Landscaping Estimates

  • Organize quantities by area, zone, material type, and phase.
  • Use current nursery, supplier, disposal, and equipment pricing.
  • Confirm plant sizes, calipers, container sizes, and substitutions.
  • Calculate soil, mulch, and aggregate by area and installed depth.
  • Separate irrigation materials, trenching, wiring, testing, and startup.
  • Adjust labor for access, terrain, slopes, weather, and occupied-site conditions.
  • Include delivery, unloading, staging, watering, and plant protection.
  • Account for equipment mobilization, fuel, hauling, and disposal.
  • Separate base work from alternates, allowances, and unit prices.
  • Use completed job-cost data to update production and waste factors.
Tip: Do not apply one labor rate to every planting item. A one-gallon perennial, a 15-gallon shrub, and a three-inch-caliper tree require different handling, excavation, staking, watering, equipment, and crew time.

Common Landscaping Estimating Mistakes

  • Using outdated plant, soil, paver, or irrigation pricing
  • Missing delivery, unloading, staging, or disposal costs
  • Failing to account for plant size and handling requirements
  • Using one production rate for all site conditions
  • Omitting soil amendments, fertilizer, stakes, ties, or root barriers
  • Underestimating irrigation trenching, sleeves, wiring, and startup
  • Ignoring slope, drainage, access, or dewatering conditions
  • Leaving plant establishment and warranty work out of the price
  • Failing to separate hardscape from planting and irrigation costs
  • Submitting pricing without clear assumptions, exclusions, and alternates

Frequently Asked Questions

What should be included in a landscaping estimate?

Include labor, plants, soil, mulch, sod, seed, irrigation, drainage, hardscape, equipment, delivery, disposal, subcontractors, supervision, maintenance, warranty, overhead, and profit.

How should plant material be estimated?

Track each plant by species or item code, size, caliper, container size, quantity, supplier cost, delivery, installation labor, staking, watering, and replacement allowance.

How are soil and mulch quantities calculated?

Multiply the installation area by the specified depth, convert the result to cubic yards or another purchasing unit, and include a configurable waste or settlement factor.

Should irrigation be estimated separately?

Yes. Separate pipe, valves, heads, dripline, fittings, controllers, wiring, sleeves, trenching, backfill, testing, startup, and winterization where applicable.

How should landscaping labor be estimated?

Estimate labor by activity and production unit, such as hours per tree, shrubs per crew day, square feet of sod per hour, linear feet of trench per hour, or square feet of pavers per crew day.

Should maintenance and establishment be included?

Include watering, mowing, pruning, weeding, fertilization, irrigation adjustments, replacements, and inspections when required during the establishment or warranty period.

What landscaping unit prices are useful?

Common unit prices include each tree or shrub, square foot of sod or planting bed, cubic yard of soil or mulch, linear foot of irrigation pipe or edging, and square foot of pavers or retaining wall face.

Can the estimate become the project budget?

Yes. After award, the approved estimate can provide the baseline for procurement, crew planning, scheduling, production tracking, change control, and job costing.

Turn Landscape Takeoffs Into Reliable Project Pricing

A structured landscaping estimate helps contractors organize quantities, labor, materials, equipment, subcontractors, indirect costs, and pricing assumptions before submitting a bid.

SimplySub can help landscaping subcontractors organize estimates, jobs, purchase orders, change orders, daily logs, invoices, documents, schedules, and job-cost information within one workflow.

Built for subcontractors who want something simple

Ready to move beyond standalone templates?

SimplySub helps you manage estimates, invoices, jobs, crews, time, equipment, photos, files, daily logs, expenses, and field activity in one easy-to-use system.