Masonry Estimate Template

Download a masonry estimate template to calculate labor, brick, block, mortar, reinforcement, scaffolding, equipment, subcontractor costs, overhead, and project pricing.

Build Detailed Masonry Estimates From Takeoff Through Final Price

A masonry estimate gives contractors a structured way to calculate labor, brick, concrete masonry units, stone, mortar, grout, reinforcement, anchors, flashing, insulation, scaffolding, equipment, freight, subcontractor costs, overhead, and profit before work begins. It helps masonry subcontractors organize pricing consistently and establish a reliable budget for procurement, scheduling, production tracking, and job costing.

This Masonry Estimate Template is designed for masonry subcontractors, bricklayers, block contractors, stone masons, restoration contractors, estimators, project managers, and construction business owners preparing bids for new construction, additions, renovations, repairs, and specialty masonry work.

What Is a Masonry Estimate?

A masonry estimate is a detailed projection of the labor, material, equipment, subcontractor, and indirect costs required to complete masonry work. It commonly includes brick veneer, concrete masonry units, structural masonry, architectural block, natural stone, manufactured stone, mortar, grout, reinforcing steel, joint reinforcement, anchors, flashing, weeps, control joints, lintels, insulation, sealants, cleaning, scaffolding, hoisting, and protection.

A useful estimate should separate wall types, materials, thicknesses, heights, bond patterns, openings, reinforcement conditions, finish requirements, and access constraints. A ground-level CMU partition, a multi-story brick veneer elevation, and a stone facade may require very different labor factors, equipment, scaffolding, detailing, and production assumptions.

Important: An estimate is a pricing document and does not replace a signed proposal, subcontract, purchase order, or approved change order. Final scope, quantities, exclusions, testing, warranties, taxes, and payment terms should be confirmed in the executed agreement.

When to Use This Template

  • Estimating brick veneer and cavity-wall construction
  • Preparing concrete masonry unit subcontractor bids
  • Pricing structural and reinforced masonry walls
  • Estimating architectural block and split-face CMU
  • Pricing natural stone and manufactured stone veneer
  • Estimating masonry restoration, repointing, and repair work
  • Pricing parapets, screen walls, shafts, site walls, and retaining walls
  • Preparing alternates for wall types, finishes, or material substitutions
  • Calculating masonry change-order pricing
  • Establishing a project budget before field production begins

Who Should Use This Template?

This template is suitable for masonry subcontractors, brick and block contractors, stone masons, restoration contractors, general contractors, estimators, project managers, superintendents, purchasing teams, and construction business owners.

It can be adapted for commercial, residential, multifamily, institutional, industrial, public, historical, hospitality, retail, educational, and healthcare projects.

What a Masonry Estimate Should Include

Estimate Section Purpose
Project and Bid Details Identifies the customer, project, estimate number, bid date, drawings, specifications, addenda, estimator, and proposal assumptions.
Masonry Takeoff Tracks wall areas, lengths, heights, thicknesses, openings, corners, piers, pilasters, parapets, and material types.
Masonry Units and Stone Calculates brick, CMU, architectural block, natural stone, manufactured stone, caps, sills, and specialty units.
Mortar, Grout, and Reinforcement Includes mortar, grout, rebar, joint reinforcement, anchors, ties, dowels, bond beams, and lintels.
Accessories and Detailing Tracks flashing, weeps, vents, control joints, expansion joints, insulation, membranes, sealants, and embedded accessories.
Labor Calculates layout, stocking, mixing, installation, reinforcement, grouting, cleaning, pointing, protection, and supervision hours.
Scaffolding and Equipment Includes scaffold erection, dismantling, mast climbers, lifts, forklifts, telehandlers, mixers, saws, pumps, and hoisting.
Subcontractors and Services Includes testing, engineering, crane service, scaffolding, insulation, firestopping, restoration, and specialty cleaning.
Indirect Costs Accounts for mobilization, freight, permits, winter conditions, heat, protection, cleanup, supervision, overhead, and contingency.
Pricing Summary Calculates direct cost, taxes, allowances, alternates, overhead, profit, gross margin, and final estimate value.

How to Use the Template

  1. Enter the customer, project, estimate number, bid date, drawings, specifications, and addenda.
  2. Separate the work by masonry system, building, elevation, floor, area, wall type, phase, and specification section.
  3. Measure gross wall area, openings, corners, piers, pilasters, parapets, screen walls, and specialty conditions.
  4. Calculate net quantities for brick, CMU, stone, mortar, grout, reinforcement, anchors, flashing, insulation, and accessories.
  5. Assign labor hours and production rates based on unit type, wall height, bond pattern, reinforcement, access, and finish requirements.
  6. Add scaffolding, lifts, telehandlers, mixers, saws, pumps, hoisting, staging, and material-handling costs.
  7. Enter supplier quotes for masonry units, stone, reinforcement, lintels, flashing, insulation, and specialty materials.
  8. Include testing, mockups, cleaning, protection, winter conditions, permits, freight, and subcontractor costs.
  9. Document allowances, alternates, unit prices, exclusions, and work by others.
  10. Apply overhead, contingency, taxes, and profit according to company policy, then review the estimate against the bid documents.
Construction example:

A masonry subcontractor estimates a three-story school addition with separate cost codes for load-bearing CMU, interior partitions, brick veneer, architectural block, bond beams, reinforced cells, loose lintels, flashing, insulation, scaffolding, winter protection, cleaning, and mockups. Labor is adjusted for wall height, reinforced pilasters, multiple brick colors, and restricted material staging around an occupied campus.

Best Practices for Masonry Estimating

  • Organize takeoffs by wall type, unit size, thickness, elevation, floor, and phase.
  • Reference the latest architectural, structural, civil, and landscape drawings.
  • Deduct openings consistently and account for jambs, heads, sills, returns, and closures.
  • Separate brick, CMU, stone, mortar, grout, reinforcement, and accessories.
  • Adjust labor for wall height, congestion, bond pattern, reinforcement, weather, and access.
  • Include scaffold erection, modifications, tie-ins, inspection, dismantling, and relocation.
  • Account for cuts, waste, breakage, color blending, samples, and mockups.
  • Include cleaning, protection, temporary heat, cold-weather work, and final washdown.
  • Separate base-bid work from alternates, allowances, and unit prices.
  • Use completed job-cost data to update production rates and waste assumptions.
Tip: Do not use one production rate for every masonry wall. Reinforced CMU, standard brick veneer, architectural block, and irregular stone veneer require different crews, handling methods, accessories, and installation time.

Common Masonry Estimating Mistakes

  • Missing jambs, returns, parapets, piers, pilasters, or screen walls
  • Deducting openings without adding back heads, sills, closures, and returns
  • Using one labor factor for all wall types and heights
  • Omitting bond beams, reinforced cells, dowels, anchors, or joint reinforcement
  • Missing flashing, weeps, vents, control joints, insulation, or sealants
  • Failing to include scaffold moves, tie-ins, inspections, and dismantling
  • Ignoring cutting, color blending, breakage, waste, and sample panels
  • Omitting winter protection, temporary heat, enclosure, and cleanup
  • Using outdated unit, mortar, reinforcement, or freight pricing
  • Submitting pricing without clear assumptions, exclusions, and alternates

Frequently Asked Questions

What should be included in a masonry estimate?

Include labor, brick, block, stone, mortar, grout, reinforcing steel, joint reinforcement, ties, anchors, flashing, weeps, insulation, lintels, scaffolding, equipment, freight, testing, indirect costs, overhead, and profit.

How should masonry quantities be measured?

Measure by the unit that matches the work, such as square feet of wall, number of masonry units, linear feet of flashing or control joints, cubic yards of grout, pounds of reinforcement, or each accessory.

Should openings be deducted from wall area?

Usually, but the estimating method should also account for jambs, heads, sills, returns, closures, lintels, and reduced productivity around openings. Small openings may be handled according to company estimating standards.

How should masonry labor be estimated?

Estimate labor by wall type and activity. Common categories include layout, stocking, mixing, laying units, installing reinforcement and accessories, grouting, cutting, pointing, cleaning, scaffold work, protection, and supervision.

How much waste should be included?

Waste depends on unit type, bond pattern, cutting, color blending, handling, breakage, wall geometry, and supplier packaging. Use configurable waste factors supported by company experience and project conditions.

Should scaffolding be estimated separately?

Yes. Include erection, dismantling, relocation, planking, guardrails, access, tie-ins, inspections, engineering where required, rental duration, and lost productivity related to access.

What masonry unit prices are useful?

Common unit prices include square feet of brick veneer, square feet of CMU by size and thickness, square feet of stone veneer, linear feet of control joints or flashing, cubic yards of grout, and hourly labor or equipment rates for extra work.

Can the estimate become the project budget?

Yes. After award, the approved estimate can provide the baseline for labor planning, procurement, scheduling, change control, production tracking, and job costing.

Turn Masonry Takeoffs Into Reliable Project Pricing

A structured masonry estimate helps contractors organize wall systems, quantities, labor, materials, reinforcement, accessories, equipment, indirect costs, and pricing assumptions before submitting a bid.

SimplySub can help masonry subcontractors organize estimates, jobs, purchase orders, change orders, daily logs, invoices, documents, schedules, and job-cost information within one workflow.

Built for subcontractors who want something simple

Ready to move beyond standalone templates?

SimplySub helps you manage estimates, invoices, jobs, crews, time, equipment, photos, files, daily logs, expenses, and field activity in one easy-to-use system.