Back to Material Takeoff Templates
Material Takeoff Template
Free Resource
Updated 2026-07-29

Material Takeoff Template

Download a material takeoff template to measure construction materials, calculate quantities, apply waste factors, estimate costs, and organise procurement for any construction project.

Measure Materials with Confidence Before You Price or Order

A material takeoff is the foundation of an accurate construction estimate. It identifies every material required to complete a project, calculates the quantities needed, and provides a structured basis for pricing, purchasing, scheduling deliveries, and controlling material costs.

This free Material Takeoff Template helps subcontractors, specialty contractors, estimators, quantity surveyors, and project managers organise material quantities from drawings and specifications before preparing estimates or issuing purchase orders. It can be adapted for residential, commercial, industrial, and civil construction projects across virtually every trade.

What Is a Material Takeoff?

A material takeoff (MTO) is a detailed list of every material required for a construction project. Quantities are measured from drawings, specifications, schedules, and project documentation before pricing is applied.

Unlike a full construction estimate, which includes labour, equipment, overheads, and profit, a material takeoff focuses specifically on physical materials and associated purchasing information.

Important: Always reference the latest drawing revisions and specifications when preparing a material takeoff. Even small design changes can significantly affect required quantities and purchasing costs.

When to Use This Template

  • Preparing construction estimates
  • Calculating material quantities from drawings
  • Requesting supplier quotations
  • Planning procurement activities
  • Ordering construction materials
  • Pricing project variations and change orders
  • Comparing estimated and purchased quantities
  • Reviewing material usage during project delivery

Who Should Use This Template?

This template is suitable for subcontractors, estimators, quantity surveyors, procurement teams, project managers, construction supervisors, and business owners responsible for estimating or purchasing materials.

It can be customised for electrical, plumbing, HVAC, roofing, framing, drywall, concrete, masonry, steelwork, glazing, flooring, waterproofing, painting, excavation, landscaping, fire protection, and many other construction trades.

What the Material Takeoff Should Include

Section Purpose
Project Information Records the project, client, estimator, revision, and drawing references.
Material Description Identifies each material, component, or product required.
Location Records where the material will be installed.
Dimensions & Measurements Captures length, width, height, depth, count, or area used to calculate quantities.
Quantity Calculations Calculates base quantities before waste factors are applied.
Waste Allowance Adds cutting, breakage, handling, and installation allowances.
Purchase Quantity Calculates the final quantity to order.
Supplier Information Records preferred suppliers, lead times, and quotation references.
Pricing Calculates unit rates and extended material costs.
Procurement Status Tracks ordering, delivery, and material availability.
Drawing References Links every quantity to supporting project documentation.
Assumptions & Notes Documents estimating assumptions and clarifications.

How to Use the Template

  1. Enter the project information and drawing references.
  2. Separate materials by trade, location, or work package.
  3. Measure quantities directly from project drawings.
  4. Apply appropriate units of measure for every material.
  5. Calculate gross quantities before deductions.
  6. Apply realistic waste factors for cutting, offcuts, and breakage.
  7. Calculate purchase quantities and supplier pack sizes.
  8. Record supplier quotations and unit costs.
  9. Review totals before issuing purchase orders or final estimates.
Construction example:

A commercial flooring contractor measures floor areas from architectural drawings before separating carpet tiles, vinyl flooring, skirting, transition trims, adhesives, moisture barriers, and accessories into individual material categories. Waste percentages are adjusted based on room layouts, installation patterns, and manufacturer recommendations before supplier quotations are requested.

Best Practices for Material Takeoffs

  • Always use the latest approved drawings.
  • Measure different material specifications separately.
  • Record manufacturer and product references where known.
  • Document all quantity assumptions.
  • Apply realistic waste percentages based on material type.
  • Separate procurement quantities from installed quantities.
  • Verify supplier pack sizes before ordering.
  • Review high-value materials independently.
  • Maintain revision history when drawings change.
  • Retain completed takeoffs for future estimating benchmarks.
Tip: Large quantities should always be independently checked before procurement. A small measurement error can result in costly over-ordering or project delays.

Common Material Takeoff Mistakes

  • Using outdated drawing revisions
  • Applying incorrect units of measure
  • Forgetting waste allowances
  • Ordering installed quantities instead of purchase quantities
  • Missing accessories, fittings, and consumables
  • Ignoring supplier pack sizes
  • Combining different material specifications together
  • Failing to record assumptions
  • Not tracking drawing revisions
  • Ordering materials before reviewing final quantities

Frequently Asked Questions

What is the difference between a material takeoff and a construction estimate?

A material takeoff measures material quantities only, while a construction estimate also includes labour, equipment, subcontract costs, overheads, profit, and other project expenses.

Should waste be included?

Yes. Waste allowances should reflect cutting, breakage, handling, offcuts, manufacturer recommendations, and project complexity.

Can supplier quotations be tracked?

Yes. The template includes supplier information, quotation references, lead times, pricing, and procurement status to assist purchasing decisions.

Can the template be used for procurement planning?

Yes. Material quantities can be grouped by supplier, delivery stage, project phase, or work package to simplify ordering and scheduling.

Should drawing references be included?

Absolutely. Every measured quantity should reference the drawing or specification from which it was derived to improve traceability and simplify future revisions.

Can this template be customised for different trades?

Yes. The workbook is designed so additional trade-specific material fields can be added while maintaining a consistent estimating workflow.

Improve Quantity Accuracy Before Materials Are Ordered

A structured material takeoff improves estimating accuracy, supports procurement planning, and reduces the risk of ordering errors. By recording quantities, supplier information, waste allowances, and drawing references in one workbook, subcontractors can build reliable estimates and better manage project costs.

As projects become more detailed, SimplySub can help subcontractors organise material takeoffs alongside estimates, purchase orders, change orders, documents, jobs, and job-cost information within a single construction management platform.

Built for subcontractors who want something simple

Ready to move beyond standalone templates?

SimplySub helps you manage estimates, invoices, jobs, crews, time, equipment, photos, files, daily logs, expenses, and field activity in one easy-to-use system.