Industry Spotlight

Simple Jobsite Management for Framing Contractors

Framing crews need quick job updates, accurate labor tracking, and easy access to plans and notes. SimplySub keeps your team aligned and your jobs moving without paperwork headaches.

$49/month, unlimited jobs and users Built for subcontractors 100 day money back guarantee
See your framing jobs at a glance
  • Track crew hours by job, floor, or section.
  • Log daily progress on walls, floors, trusses, decks, and inspections.
  • Record materials such as lumber, hardware, sheathing, and connectors.
  • Capture job photos to document progress and inspection readiness.
Built for residential & commercial framing crews
Watch the overview

See SimplySub in action for framing jobs

A quick 2-minute walkthrough showing how crews track time, loads, and equipment without slowing down the work.

Press play to watch the demo

Framing work is fast-paced and full of moving parts

Crews jump between floors, walls, and structural elements while juggling GC requests, inspections, and weather delays. When timecards, notes, and updates are scattered or handwritten, jobs slow down and the office gets blindsided.

  • Poor job visibility leads to delays and unexpected labor costs.
  • Paper timecards slow down payroll and reduce costing accuracy.
  • Material usage tracked in notebooks that never reach the office.
  • Lack of photo documentation during inspections increases risk.

SimplySub keeps your framing jobs organized in real time

SimplySub gives framing contractors everything they need to keep projects moving — without complicated project management software.

  • Simple timecards crews complete in seconds on site.
  • Track production by floor, wall, deck, truss, or section.
  • Log materials used so the office knows what is missing or overrun.
  • Photos and notes organized so inspections go smoothly.

How framing crews use SimplySub every day

From layout to final sheathing, SimplySub helps framing crews stay aligned, efficient, and documented.

Track crew hours by floor or task

Foremen log hours by job, task, or area so you know how much labor went into walls, decks, trusses, punch items, and more.

Log daily production progress

Record which walls were stood, which floors were decked, and which areas passed inspection. Keep a clear historical log of what moved forward each day.

Track lumber & hardware used

Log studs, LVLs, headers, sheathing, nails, hangers, hardware, and connectors. Helps the office understand material burn rate and missing shipments.

Capture photos for inspections

Take photos before calling for inspections. Store all framing details, safety items, and structural connections in one simple place.

Keep GC instructions organized

Track RFI answers, change requests, corrections, and field notes in one hub. No more digging through scattered text threads.

Give office staff the clarity they need

See production, photos, and labor in real time so billing, scheduling, and project decisions are faster and more accurate.

What framing contractors get with SimplySub

SimplySub delivers the tools that matter most for framing projects — without the unnecessary complexity of GC-focused software.

Cleaner job costing

See labor, materials, and progress by job so you know which projects are profitable.

Faster payroll & billing

Organized time and job activity make invoicing and payroll much quicker.

Better communication

Share clear records of what was completed, inspected, or corrected when GCs ask questions.

Less stress for owners

Know what happened on every framing job each day — without chasing foremen for updates.

One simple plan, unlimited jobs, unlimited users, built specifically for contractors like you.

Perfect fit for framing contractors who
  • Run multiple crews or multi-story builds at once.
  • Want simple tools their teams will actually use on site.
  • Need better documentation for inspections and GC requests.
  • Do not want the cost or complexity of GC software.
View Pricing for SimplySub

One simple plan. Unlimited users. Unlimited jobs. Free training included.

Framing contractors, your questions answered

A quick FAQ for framing companies considering SimplySub for jobsite management.

Yes. SimplySub is designed specifically for subcontractors, including framing crews. It focuses on timecards, production tracking, materials, notes, and job photos — without the slow, complex features found in GC software.

Yes. Foremen and crews can log hours, track production, upload photos, and record notes directly from their phones. Everything goes straight to the office so you always know what was completed each day.

SimplySub groups labor, materials, and production by job, floor, or section so you can see the real cost of each part of the build. This helps you invoice accurately and understand which projects are performing well.

Yes. SimplySub is designed to be fast and simple with large buttons and clean screens. Most crews learn it in minutes and prefer it over paper or text-based communication.

SimplySub is $49 monthly or $475 annually, with unlimited jobs, unlimited users, free support, and free training. No contracts. Cancel anytime. Covered by a 100-day money back guarantee.

Compare SimplySub to other tools by Framing Contractors

If you’re switching from another platform, these quick comparisons are written specifically for framing contractors workflows, focusing on how each tool handles jobsite tracking, crew time, photos, materials, and daily reporting in real-world operations.

Ready to organize your framing jobs with SimplySub?

Start a free trial, invite your team, and use SimplySub on a real job. If it doesn’t make your day easier inside 100 days, you get your money back.