Evaluating jobsite software for dirt work. Procore is built for large GC coordination. SimplySub is the simple field system for clearing and grading crews, timecards, daily logs, job photos, and material tracking tied to each job.
Cancel anytime, 100-day money-back guarantee.
| SimplySub plan | One plan, unlimited users and jobs, ideal for multi-crew operations. |
| Clearing & grading workflows | Timecards, daily logs, job photos, notes, and material usage tied to each job. |
| Best fit | Clearing and grading contractors that want clean daily visibility without heavy coordination overhead. |
| When Procore fits better | Large GC-driven projects with heavy document coordination, RFIs, submittals, and multiple stakeholders. |
Procore is a powerful GC coordination platform. SimplySub is intentionally focused on field execution for subs, track time, daily logs, photos, and materials per job.
Procore does a lot, coordination, documents, approvals, and cross-team communication. But dirt crews often mainly need to know who was on site, what was done, what changed, and to capture photos and notes that back up production. That is usually when teams look for a lighter, field-first tool like SimplySub.
Foremen want to log time and a daily note fast, not click through layers meant for GC administration. When the workflow is slow, field adoption drops.
Dirt work moves fast and site conditions change daily. If photos are not tied to a daily log and a job record, proof of work is hard to find when questions pop up.
Hauls, stone, pipe, fabric, and fuel add up. Without simple daily material logs tied to each job, it is hard to see where margin moved and why.
A dirt work view of how SimplySub compares to Procore so you can decide which platform matches the way your crews work today.
| SimplySub | Procore | |
|---|---|---|
| Primary focus | Field execution and daily jobsite documentation. | GC coordination and project administration. |
| Best at | Timecards, daily logs, job photos, notes, and material usage tied to each job. | RFIs, drawings, submittals, stakeholder workflows, and GC-level reporting. |
| Field experience | Designed for foremen to log work fast from a phone. | Powerful, but can be heavier for quick daily field updates. |
| Best fit | Clearing and grading subs who want simple daily visibility across crews and jobs. | Teams managing large projects with complex coordination and documentation requirements. |
| Using both | Use SimplySub internally for field tracking and job history. | Use Procore to coordinate with the GC where required. |
If the GC requires Procore, you still want an internal system that crews will actually use every day. That is where SimplySub fits.
SimplySub focuses on the daily workflows dirt crews actually need, track labor, capture job photos, log daily notes, and record materials so the office has a clean job record.
Log hours tied to the job so payroll and job costing inputs stay accurate without chasing paper time.
Capture changing site conditions, staking, rough grade, final grade, and haul activity with photos tied to the job.
Record what got done, what changed, and what is blocking production, clear notes the office can see instantly.
Track stone, pipe, fabric, loads, and other materials tied to the job so you can spot cost creep early.
Learn more on the dedicated clearing and grading contractor solutions page.
Clearing and grading companies add operators, laborers, and subcontracted trucks constantly. SimplySub is designed so you do not have to count licenses every time staffing changes.
If the GC requires Procore, you can still keep your internal jobsite tracking simple. Many subs use SimplySub for daily timecards, job logs, photos, and material tracking, then use Procore only where the GC requires it.
Procore is a powerful platform for GC coordination on large projects. SimplySub is a simple field system for clearing and grading contractors to capture time, daily logs, job photos, and material usage tied to each job, without heavy overhead.
A quick dirt-work focused overview for subs comparing SimplySub and Procore.
Unlimited users, unlimited jobs.