How to Create a Photo Progress Report

Learn how to generate branded PDF photo progress reports from job photos in SimplySub, filter images by date, and share updates with customers.

Updated 2026-11-22

Overview

SimplySub makes it easy to create professional photo progress reports using photos already uploaded to your jobs.

With the built-in Photo Report feature, you can generate a PDF containing job photos, their associated categories, and a custom report title. You can also filter photos by date range, making it convenient to document progress over a specific period.

Photo progress reports are especially useful for keeping customers informed, documenting completed work, and providing visual updates alongside invoices.

Instead of manually collecting photos and building a report from scratch, SimplySub lets you generate a PDF directly from the job's existing photo library.

Before You Begin

Before generating a photo report, make sure the photos you want to include have already been uploaded to the appropriate job in SimplySub.

For a more professional presentation, consider configuring your company's logo and brand colors in SimplySub. These branding elements can be used to personalize your generated reports.

Step 1: Open the Job's Files and Photos

Photo progress reports are generated directly from an individual job.

  1. Log in to your SimplySub workspace.
  2. Open the job for which you want to create a photo progress report.
  3. Navigate to the job's Files area.
  4. Locate the Photo Report option.
  5. Click Photo Report to begin creating your report.

SimplySub opens the photo report generation interface, where you can provide a report title and choose which photos to include.

Step 2: Enter a Photo Report Title

Give your report a descriptive title so the recipient can easily identify its purpose.

  1. Locate the report title field.
  2. Enter the title you want displayed on the report.
  3. Review the title before generating the PDF.

For example, you might use:

  • Photo Progress Report
  • Customer XYZ - Weekly Progress Report
  • Jobsite Progress Update
  • Project Completion Photos
  • Weekly Construction Progress

The title you enter appears on the first page of the generated PDF.

You can use short or more descriptive titles depending on your customer's needs.

Step 3: Select Photos Using a Date Range

SimplySub allows you to filter job photos by date range when generating a photo report.

This is especially helpful for long-running jobs where you want to share only the photos associated with a particular reporting period.

  1. Open the Photo Report interface for the job.
  2. Review the available photo date range options.
  3. Select the date range corresponding to the photos you want to include.
  4. Continue with the report generation process.

For example, if you provide customers with weekly progress updates, you can use the date range to focus the report on photos from that week.

If you want a report containing all available job photos, you can generate the report without narrowing the photo selection to a specific reporting period.

Step 4: Generate the Photo Progress Report PDF

Once you've entered a report title and selected your desired photos, you're ready to generate the PDF.

  1. Confirm that your report title is correct.
  2. Review your photo selection or date range.
  3. Click Generate PDF.
  4. SimplySub begins creating your photo progress report.
  5. During processing, you may see a temporary screen displaying Generating PDF Report.
  6. Once processing finishes, the generated PDF report becomes available for viewing.

The resulting PDF includes your custom report title and the selected job photos.

Step 5: Review the Generated Photo Report

After the PDF has been generated, review the report before sharing it with your customer.

The report includes:

  • Report Title: The custom title you entered during report generation.
  • Photo Categories: The categories associated with the uploaded job photos.
  • Job Photos: The actual images included in the report.
  • Annotated Photos: Photos that have been annotated can appear with their annotations included.

For example, if you previously annotated a photo to identify a specific piece of equipment or highlight work performed, that annotated image can appear in your generated report.

Review the photos and report title to make sure the PDF contains the information you want to share.

Step 6: Download and Share the Photo Report

After generating your photo progress report, you can download the PDF to your computer.

  1. Open the generated PDF photo report.
  2. Download the PDF to your device.
  3. Save the document using a descriptive filename.
  4. Share the PDF with your customer using your preferred communication method.

Photo reports can be shared in several ways, including:

  • Customer Progress Updates: Send daily or weekly photo updates showing work performed.
  • Invoice Supporting Documentation: Include the downloaded PDF when sending invoices to provide visual documentation of the work.
  • Project Status Updates: Share visual progress information with customers or project stakeholders.
  • Project Completion Documentation: Provide a collection of photos showing completed work.

Because the report is generated as a PDF, it can be saved and shared without requiring the recipient to access the SimplySub job record.

Using Photo Reports for Weekly Customer Updates

For larger or longer-running projects, consider establishing a regular photo reporting schedule with your customers.

For example, you might provide a weekly progress report every Friday.

  1. Throughout the week, upload photos documenting work performed on the job.
  2. At the end of the reporting period, open the job's Photo Report feature.
  3. Enter a descriptive title such as Weekly Photo Progress Report.
  4. Select the date range covering the reporting period.
  5. Click Generate PDF.
  6. Download the report and send it to your customer.

Providing regular visual updates helps customers understand how their projects are progressing without requiring frequent phone calls or additional jobsite visits.

It can also demonstrate your company's attention to detail and commitment to keeping customers informed.

Using Company Branding in Photo Reports

SimplySub supports company branding through uploaded logos and configured brand colors.

Before creating customer-facing photo reports, consider reviewing your company's branding configuration to ensure your logo is available and displayed appropriately.

SimplySub supports different logo variations, including logos intended for light or dark backgrounds and smaller display sizes.

Using appropriately configured logos and colors helps create a more consistent appearance across your customer-facing documents.

Helpful Tips

  • Upload photos regularly: Keeping your job's photo library updated makes it easier to create progress reports when needed.
  • Use descriptive report titles: Include the project name, customer, or reporting period to help recipients identify the report.
  • Filter by date: For long-running projects, use date ranges to focus each report on a specific period of work.
  • Use photo categories: Organizing uploaded photos into appropriate categories helps provide context within the generated report.
  • Include annotated photos: Use annotated job photos when you want to highlight particular equipment, conditions, or work details.
  • Share reports with invoices: Photo documentation can help customers understand the work associated with an invoice.
  • Consider recurring updates: Weekly photo reports are a practical way to keep customers informed during larger projects.

Frequently Asked Questions

How do I create a photo progress report in SimplySub?

Open the job, navigate to its Files area, select Photo Report, enter a report title, choose your desired photo date range, and click Generate PDF.

Can I create a PDF containing all photos from a job?

Yes. You can generate a photo report using all available photos rather than limiting the selection to a specific date range.

Can I create weekly photo progress reports?

Yes. Use the photo date range options to select photos from a particular week, then generate the PDF and share it with your customer.

Will annotated photos appear in the report?

Yes. Annotated photos can be included in the generated PDF, allowing you to share images with their existing annotations.

Can I customize the title of my photo report?

Yes. SimplySub allows you to enter a custom report title, which appears on the first page of the generated PDF.

Can I include photo progress reports with customer invoices?

Yes. Download the generated photo report as a PDF and include it with your customer invoice or other project communications.

Does SimplySub automatically send weekly photo reports?

The Photo Report feature allows you to generate and download reports whenever needed. The workflow described here involves manually generating and sharing the PDF for each reporting period.

Need Help?

If you need assistance creating photo progress reports, configuring company branding, or working with job photos, contact the SimplySub support team for guidance.