How to View Vehicle Route History in SimplySub GPS Tracking

Learn how to view vehicle GPS route history in SimplySub, review speed and odometer details, and filter historical routes by date and time.

Updated 2026-11-22

Overview

SimplySub's GPS Tracking system includes a Route History feature that allows you to review where your vehicles have traveled over a selected period of time.

Instead of viewing only a vehicle's current location, Route History displays historical GPS tracking activity, including the vehicle's starting location, individual tracking points along its route, and its ending location.

You can also select individual GPS points to review additional information, including vehicle speed, heading, and odometer readings.

This feature is useful for reviewing vehicle activity, understanding routes taken by your crews, and checking whether a vehicle traveled to a particular location during a specific time period.

Step 1: Open GPS Tracking

To review a vehicle's historical route, begin in the GPS Tracking area of SimplySub.

  1. Log in to your SimplySub workspace.
  2. Navigate to the GPS Tracking area.
  3. Review the available tracked vehicles.
  4. Find the vehicle whose route history you want to inspect.

The GPS Tracking interface displays information about your tracked vehicles, including their current reported activity.

For example, you may see one vehicle that is moving and another that is stationary or turned off.

Step 2: Open a Vehicle's Route History

Once you've located the vehicle you want to review, you can open its historical tracking information.

  1. From the GPS Tracking area, select the desired vehicle.
  2. Locate the Route History option.
  3. Click Route History.
  4. SimplySub loads the available GPS activity for that vehicle.

By default, Route History displays activity from the previous one hour.

This gives you a quick way to review the vehicle's recent movements without needing to configure a custom date range.

Step 3: Understand the Route History Display

When Route History opens, SimplySub displays the vehicle's recorded GPS route for the selected time period.

The route information includes:

  • Starting Location: Where the recorded route begins within the selected time period.
  • GPS Tracking Points: Individual recorded locations along the vehicle's route.
  • Ending Location: Where the recorded route ends within the selected time period.

This allows you to visualize the vehicle's movements and understand the path it traveled.

You can review the route on the map and scroll through the individual GPS tracking points to inspect specific locations.

Step 4: View Individual GPS Tracking Points

Route History allows you to inspect individual GPS points rather than relying only on the overall route displayed on the map.

To review a specific tracking point:

  1. Open the desired vehicle's Route History.
  2. Scroll through the list of recorded GPS points.
  3. Locate a point you want to investigate.
  4. Click the individual GPS point.
  5. SimplySub brings you directly to that location and displays its associated details.

This is useful when you want to inspect a particular portion of a vehicle's route or understand what the GPS system recorded at a specific point.

Step 5: Review Speed, Heading, and Odometer Details

Each recorded GPS tracking point can provide additional information about the vehicle at that location.

Depending on the information recorded for that point, you can review details such as:

  • Vehicle Speed: How fast the vehicle was traveling at the recorded point.
  • Heading: The direction the vehicle was traveling.
  • Odometer Reading: The vehicle's recorded odometer information.
  • GPS Location: The specific point associated with the vehicle's recorded activity.

For example, if you want to know how fast a vehicle was traveling at a particular location, select the corresponding GPS point to review its recorded speed.

The ability to inspect individual points provides more detail than viewing the route line alone.

Step 6: Change the Route History Date Range

By default, SimplySub displays the vehicle's GPS activity from the last hour.

However, you can change the reporting period to review activity from a different date or time.

  1. Open the vehicle's Route History.
  2. Locate the date range controls near the top of the Route History interface.
  3. Select the desired start date.
  4. Select the desired end date.
  5. Adjust the corresponding start and end times using the time controls.
  6. Click Apply.

SimplySub updates the Route History display to show the available GPS activity within your selected date and time range.

This makes it possible to review a specific period without having to examine unrelated vehicle activity.

Example: Reviewing a Vehicle's Route From an Earlier Date

Suppose you want to review where a company vehicle traveled during a previous workday.

  1. Select the vehicle in GPS Tracking.
  2. Open Route History.
  3. Change the start date and time to the beginning of the period you want to review.
  4. Set the end date and time to the end of that period.
  5. Click Apply.
  6. Review the displayed route and select individual GPS points for additional details.

This helps you investigate historical vehicle activity within a specific time window.

Step 7: Navigate the Route History Map

The Route History map supports standard map navigation, allowing you to inspect different portions of a recorded route.

You can:

  • Zoom In: Examine a smaller geographic area in greater detail.
  • Zoom Out: View a larger portion of the recorded route.
  • Pan the Map: Move around the map to inspect different locations.
  • Select GPS Points: Open recorded location details for individual tracking points.

These controls are especially useful when a vehicle has traveled across a large geographic area or when you need to examine a specific portion of its route.

Common Uses for Vehicle Route History

Reviewing Where a Vehicle Traveled

Use Route History to review the path a company vehicle traveled during a selected time period.

This can help you understand the vehicle's recorded movements throughout the day.

Checking a Vehicle's Visit to a Location

If you need to investigate whether a vehicle traveled to a particular address or jobsite, open its Route History and select the date and time range you want to review.

Inspect the recorded route and individual tracking points to determine whether the available GPS information shows the vehicle near the location.

Reviewing Vehicle Speed

Select a recorded GPS point to review the speed associated with that location.

This provides additional context about the vehicle's recorded activity at a particular point along its route.

Reviewing Historical Vehicle Activity

When you need to investigate activity from an earlier period, adjust the start and end dates and times rather than relying on the default one-hour view.

This allows you to focus on the historical tracking information relevant to your question.

Helpful Tips

  • Start with the default view: Route History automatically loads the previous hour of activity, making it convenient to review recent movements.
  • Use specific date and time ranges: Narrow the reporting period when investigating a particular trip or location.
  • Inspect individual points: Click recorded GPS points to view additional details such as speed, heading, and odometer information.
  • Use map navigation: Zoom and pan to examine the portion of the route that interests you.
  • Review the available GPS records: Route History displays recorded tracking information for the selected period, so use the individual points when examining vehicle activity.

Frequently Asked Questions

What is Route History in SimplySub GPS Tracking?

Route History allows you to view a vehicle's previously recorded GPS activity, including its starting location, individual tracking points, and ending location for a selected date and time range.

How do I view a vehicle's previous route?

Open GPS Tracking, select the vehicle, and click Route History. You can then review the map and the available GPS tracking points.

What time range does Route History show by default?

Route History automatically displays the vehicle's available GPS activity from the previous one hour.

Can I view GPS routes from a specific date and time?

Yes. Use the start and end date controls, adjust the corresponding times, and click Apply to display available GPS records for that period.

Can I see how fast a vehicle was traveling?

Yes. Select an individual GPS tracking point to review its recorded speed and other available information, including heading and odometer details.

Can I zoom in on a specific portion of the route?

Yes. The Route History map supports zooming and panning, allowing you to examine different areas along the recorded route.

Need Help?

If you need assistance reviewing vehicle GPS routes, selecting historical date ranges, or interpreting individual tracking points, contact the SimplySub support team for guidance.