OneStepGPS Setup Guide

One Step GPS gives subcontractors a simple, affordable way to bring live asset visibility directly into the software they already use every day.

Updated 2026-11-21

Overview

One Step GPS gives subcontractors a simple, affordable way to bring live asset visibility directly into the software they already use every day. With low-cost tracking, fast implementation, and a setup process designed to be straightforward, SimplySub makes it easy to start monitoring vehicles, equipment, and other field assets without the complexity of juggling a separate fleet platform. Because it is fully integrated with SimplySub, your team can manage tracking inside the same system they already rely on for jobs, crews, and day-to-day operations.

Once connected, you can view your vehicles, equipment, and assets on one unified map alongside your jobsites, giving your team a clearer picture of where everything is at a glance. With near real-time updates, you can stay on top of movement as it happens and make better decisions in the field. You can also see key details like current location, speed, and engine status, helping improve visibility, reduce guesswork, and keep your operation running smoothly from a single system.

DataQueue Webhook URL

https://api.simplysub.com/v1/integrations/gps/one-step-gps/webhook?access_token=XXXXXXXX

IMPORTANT; be sure to replace the XXXXX at the end with your own SimplySub API key as discussed in the video below

Device Data Point Filter

Ensure the following data points are turned on within the DEVICE POINTS section of your DataQueue Integration setup within OneStepGPS

  • ACC(ignition)

  • Battery Backup Voltage

  • Change Oil Lamp On

  • Factory ID

  • Heading

  • Location (Lat/Lng)

  • Number of Satellites

  • Oil Pressure Lamp On

  • SPeed

  • Remaining Battery Percent

  • Transmit Time

  • Device ID

  • DT Server

  • Posted Speed Limit

  • Best Distance Delta

  • Computed VBUS Fuel Delta

  • Drive Status

  • Drive Status Duration

  • Fuel Percent

  • Odometer

 

Setup Video