US Fleet Tracking

SimplySub GPS powered by US Fleet Tracking gives subcontractors a simple, affordable way to bring asset visibility directly into the software they already use every day.

Updated 2026-11-21

Overvie

SimplySub GPS powered by US Fleet Tracking gives subcontractors a simple, affordable way to bring asset visibility directly into the software they already use every day. With low-cost tracking, fast implementation, and a setup process designed to be straightforward, SimplySub makes it easy to start monitoring vehicles, equipment, and other field assets without the complexity of managing a separate fleet platform. Because it is fully integrated with SimplySub, your team can manage tracking inside the same system they already rely on for jobs, crews, and daily operations.

Once connected, SimplySub GPS lets you view your vehicles, equipment, and assets on one unified map alongside your jobsites, giving your team a clear real-world picture of where everything is at a glance. Data updates every 60 seconds, helping you stay informed throughout the workday without constant guesswork. You can also see key details like current location, speed, and engine status, making it easier to improve accountability, increase visibility, and keep your operation running smoothly from a single system.

US Fleet Tracking Support Details

Monday – Friday 7am-7pm CST and Saturday 9am-4pm CST. They can be reached via phone 405-726-9900 Option 3, Email: Support@USFT.com

Setup Video