How to Add, Remove, Rename, and Rearrange Job Status Columns

Learn how to customize SimplySub's Jobs Board by rearranging, adding, renaming, or hiding job status columns and configuring estimate approval statuses.

Updated 2026-11-22

Overview

SimplySub allows you to customize the status columns displayed on your Jobs Board so they reflect the way your company manages projects.

You can rearrange existing columns, rename job statuses, add new statuses, and hide statuses you no longer need.

For example, your company might organize jobs into stages such as Bid, Awarded, Scheduled, and Project Complete. You can customize these statuses and their display order to better match your workflow.

Job statuses also support an important automation feature: when a customer accepts an estimate, SimplySub can automatically move the associated job into a designated status.

In this guide, you'll learn how to manage your job status columns and configure the settings that control their behavior.

Step 1: Open Job Status Settings

Job status columns are managed through your workspace's administrative settings.

  1. Log in to your SimplySub workspace.
  2. Navigate to Admin Settings.
  3. Under System Lists, select Job Statuses.

This screen displays the job statuses configured for your workspace.

From here, you can organize existing statuses, edit their settings, and create additional statuses.

Step 2: Rearrange Job Status Columns

The order of your job statuses determines the order in which their columns appear on the Jobs Board.

SimplySub provides a drag-and-drop interface for reorganizing them.

  1. Open Admin Settings > System Lists > Job Statuses.
  2. Locate the job status you want to move.
  3. Find the small black drag handle beside that status.
  4. Click and hold the handle.
  5. Drag the status up or down to your preferred position.
  6. Release the handle when the status is in the desired order.

How Status Order Affects the Jobs Board

The job status list corresponds directly to the horizontal layout of the Jobs Board:

  • Top of the list: Appears toward the left side of the Jobs Board.
  • Bottom of the list: Appears toward the right side of the Jobs Board.

For example, if you want Bid to be your first Jobs Board column, drag it to the top of the job status list.

If you want Project Complete to appear as your final visible column, position it after your other active job statuses.

This makes it easy to arrange your Jobs Board in the same order that projects typically move through your business.

Step 3: Remove a Job Status Column From the Jobs Board

If your company no longer uses a particular job status, you can remove its column from the Jobs Board by marking that status inactive.

For example, if your workspace includes a Callback status that your team no longer needs, you can deactivate it.

  1. Navigate to Admin Settings > System Lists > Job Statuses.
  2. Find the job status you want to remove from the Jobs Board.
  3. Click Edit for that status.
  4. Locate the field labeled Status.
  5. Change the setting to Inactive.
  6. Click Save.
  7. Return to the Jobs Board and refresh the page.

The inactive job status will no longer appear as a column on the Jobs Board.

Important: This process deactivates the job status rather than requiring you to delete it.

Step 4: Rename an Existing Job Status

If an existing status represents the correct stage of your workflow but uses terminology that doesn't match your business, you can rename it.

For example, your company might prefer the term Estimating or Quoting instead of Bid.

  1. Open Admin Settings > System Lists > Job Statuses.
  2. Locate the status you want to rename.
  3. Click Edit.
  4. Update the status name to your preferred terminology.
  5. Save your changes.

Renaming an existing status is a practical option when its meaning is already close to the workflow stage you want to represent.

For example, rather than creating a separate Estimating status alongside Bid, you could rename the existing Bid status.

Step 5: Add a New Job Status

You can also create additional statuses when your company needs to track a workflow stage that isn't already represented.

  1. Navigate to Admin Settings > System Lists > Job Statuses.
  2. Click Add New.
  3. Configure the new job status using the available fields.
  4. Save the new status.
  5. Review its position in the job status list and rearrange it if necessary.

Adding custom job statuses allows you to tailor the Jobs Board to your company's processes.

For example, your workflow might include stages for estimating, awaiting customer approval, scheduling, performing work, and completing a project.

Step 6: Configure the Estimate Approval Target

If your company uses SimplySub's estimating features, an important job status setting is the Estimate Approval Target.

This setting determines which job status SimplySub automatically assigns when a customer accepts an estimate associated with a job.

For example, if your company tracks new opportunities under Bid, you might want accepted estimates to move their associated jobs into Awarded.

How to Configure the Estimate Approval Target

  1. Open Admin Settings > System Lists > Job Statuses.
  2. Locate the job status that should represent an accepted estimate, such as Awarded.
  3. Click Edit.
  4. Find the Estimate Approval Target setting.
  5. Set this option to Yes.
  6. Save your changes.

When a customer accepts an estimate, SimplySub automatically updates the associated job to the status configured as the estimate approval target.

Example: Automatically Moving a Job From Bid to Awarded

Consider the following workflow:

  1. You create a job with the status Bid.
  2. You prepare an estimate for the customer.
  3. You send the estimate to the customer.
  4. The customer accepts the estimate.
  5. SimplySub automatically changes the associated job's status to Awarded, provided Awarded is configured as the estimate approval target.

This helps your team identify which jobs have been approved and are ready for the next steps, such as scheduling crews or ordering materials.

Important: If you use SimplySub Estimates, keep an appropriate job status configured as your estimate approval target.

Important: Keep the Archived Job Status Active

When organizing your job statuses, it's recommended that you do not deactivate the Archived status.

The Archived status serves a separate purpose from the regular workflow columns on your Jobs Board.

Archived jobs do not appear as a standard column on the Jobs Board, so there is no need to deactivate this status simply to remove it from your board's visible workflow.

Recommendation: Leave the Archived job status active, even if you don't want archived jobs displayed among your regular job stages.

Helpful Tips

  • Organize statuses in workflow order: Arrange your job statuses from the earliest stage of a project to the final stage.
  • Remember top means left: The top of the Job Statuses list corresponds to the left side of the Jobs Board.
  • Use Inactive to hide columns: If a job status is no longer needed on the Jobs Board, change its Status setting to Inactive.
  • Rename before creating duplicates: If an existing status already represents the same process, consider renaming it instead of creating another status.
  • Keep Archived active: The Archived status does not appear as a regular Jobs Board column and should generally remain active.
  • Configure estimate approvals: If you send estimates through SimplySub, make sure an appropriate job status is configured as the Estimate Approval Target.
  • Refresh the Jobs Board: After deactivating a status, reload the board to see the updated columns.

Frequently Asked Questions

How do I rearrange columns on the SimplySub Jobs Board?

Navigate to Admin Settings > System Lists > Job Statuses. Use the black drag handles to move statuses up or down. Statuses near the top appear on the left side of the Jobs Board, while statuses near the bottom appear toward the right.

How do I remove a column from the Jobs Board?

Open Admin Settings > System Lists > Job Statuses, edit the status you want to hide, change its Status to Inactive, and save. Refresh the Jobs Board to see the change.

Can I rename Bid to Estimating?

Yes. Find the Bid status under Job Statuses, click Edit, change its name to Estimating, and save your changes.

Can I create additional job status columns?

Yes. From Admin Settings > System Lists > Job Statuses, select Add New to create another job status. You can then position it within your workflow.

What happens when a customer accepts an estimate?

If you have configured an Estimate Approval Target, SimplySub automatically moves the job associated with the accepted estimate into the designated job status.

Should I deactivate the Archived status?

No. It's recommended that you leave the Archived status active. Archived does not appear as a standard column on the Jobs Board, so deactivating it is unnecessary.

Need Help?

If you need assistance customizing your job statuses, reorganizing your Jobs Board, or configuring automatic status changes after estimate acceptance, contact the SimplySub support team for guidance.