Overview
SimplySub's Time & Attendance system can capture GPS location information when employees clock in and clock out, giving administrators additional visibility into where time punches occur.
However, GPS coordinates may occasionally be unavailable because of location permissions on an employee's mobile device.
SimplySub provides GPS diagnostic information directly within the time punch management interface, allowing administrators to investigate missing GPS coordinates and understand why a location was not captured.
In this guide, you'll learn how to review GPS errors, understand denied location permissions, and interpret GPS accuracy information.
Why GPS Coordinates May Be Missing
GPS location access is controlled by the employee's device and its operating system. Both Apple iOS and Android require users to grant permission before applications can access their location.
There are several reasons why SimplySub may be unable to capture GPS coordinates during a clock-in or clock-out:
- Device location services are disabled: Location services may be turned off entirely on the employee's device.
- Application location access is denied: The employee's device may be configured to prevent SimplySub from accessing location information.
- The employee declines a location permission request: When prompted to allow access to their location, the employee may select an option that denies permission.
Because location permissions are controlled by the device and its user, SimplySub cannot automatically override those restrictions.
Administrators can, however, review the GPS diagnostic information associated with a time punch to better understand why location information is missing.
How to Investigate Missing GPS Coordinates
If an employee's clock-in or clock-out does not contain GPS coordinates, you can review the individual time punch details.
- Open the relevant employee time punch within SimplySub's Time & Attendance management interface.
- Locate the employee and the time punch you want to investigate.
- Click Manage for the employee's time entry.
- A management panel opens on the right side of the screen.
- Locate the Clock In section.
- Click Manage under Clock In to review its details.
- Look for the GPS information and any associated error message.
If location information was not collected, SimplySub may display GPS Not Captured along with a more specific GPS error.
This diagnostic information can help explain why coordinates were unavailable for that particular time punch.
Understanding GPS Error Code 1: User Denied Geolocation
One GPS error that administrators may encounter is:
GPS Error: Code 1 — User Denied Geolocation
This error indicates that the location request was denied by the employee's device or its location permission settings.
For example, this can occur when an employee selects a denial option after being prompted to allow location access.
When you see this message, SimplySub is reporting that the location request was denied rather than successfully returning GPS coordinates.
Important: A geolocation permission-denied error does not, by itself, establish that an employee intentionally disabled GPS tracking. Device settings or previously denied permissions can also prevent location access.
How to Review GPS Errors for Clock-Outs
GPS diagnostic information is available for clock-out events as well as clock-ins.
- Open the employee's time punch management panel.
- Locate the Clock Out section for the relevant punch.
- Click Manage to review the clock-out details.
- Check whether GPS coordinates were captured.
- If GPS was not captured, review the available error information.
Reviewing both clock-in and clock-out details can help administrators distinguish between individual location capture events.
Understanding GPS Accuracy Information
When GPS coordinates are successfully captured, SimplySub can display additional location details, including GPS accuracy.
GPS accuracy provides an indication of how precise the reported location is.
SimplySub may use different GPS acquisition approaches that balance the time needed to obtain a location with the accuracy of the resulting coordinates.
Fast GPS Acquisition
Fast GPS acquisition prioritizes obtaining location information quickly.
In the described acquisition approach, typical accuracy may range from approximately 5 to 50 meters.
This means the reported location may be less precise, but the device can generally return a location more quickly.
Slow GPS Acquisition
Slow GPS acquisition prioritizes obtaining a more accurate location reading.
In the described acquisition approach, accuracy may reach approximately 0 to 5 meters under favorable conditions.
However, collecting a more precise location can take longer because the device may need additional time to establish a suitable location fix.
Note: GPS accuracy varies depending on the device, available location signals, and surrounding environment. These ranges are illustrative and are not guaranteed for every time punch.
How to Troubleshoot GPS Permission Issues
If an employee's time punch reports a geolocation permission error, the employee may need to review the location permissions on their device.
Check Device Location Services
Ask the employee to verify that location services are enabled on their mobile device.
If location services are disabled at the device level, applications may be unable to retrieve GPS coordinates.
Review SimplySub Location Permissions
The employee should also verify that their device allows SimplySub to access location information.
On Apple and Android devices, location permissions are controlled through the device's privacy or application settings.
The exact setting names and menu locations vary by operating system and device version.
Review Location Permission Prompts
If SimplySub requests access to the employee's location, the employee must grant the appropriate permission for location information to be available.
If permission is denied, SimplySub may be unable to capture GPS coordinates for that time punch.
Review the Time Punch Again
After reviewing the device's location settings, monitor subsequent clock-in or clock-out events to determine whether GPS coordinates are successfully captured.
The GPS diagnostic details can help administrators identify whether the same permission issue continues to occur.
Helpful Tips for Administrators
- Check the specific error: Rather than relying only on a missing GPS indicator, open the time punch details to review the available GPS error information.
- Review clock-in and clock-out separately: Each event can have its own GPS capture information.
- Understand device permissions: GPS access depends on permissions granted through the employee's mobile device.
- Consider GPS accuracy: When coordinates are captured, review the accuracy information to better understand the precision of the location reading.
- Avoid assumptions: A missing GPS coordinate or permission-denied error does not automatically prove employee misconduct.
Frequently Asked Questions
Why does an employee's clock-in say GPS Not Captured?
This means SimplySub did not capture GPS coordinates for the clock-in event. Possible causes include disabled device location services, denied application permissions, or a rejected location permission request.
What does GPS Error Code 1 mean?
Code 1 — User Denied Geolocation indicates that the device denied the location request. Administrators can review the error in the time punch management panel.
Does GPS Error Code 1 mean the employee deliberately turned off GPS?
Not necessarily. Although the error can occur when an employee declines a location permission request, it can also reflect device permissions that were previously denied or restricted.
Can administrators review GPS errors for clock-outs?
Yes. The time punch management interface provides GPS diagnostic information for clock-out events as well as clock-ins.
What is the difference between fast and slow GPS acquisition?
Fast GPS acquisition prioritizes speed and may return a less precise location. Slow GPS acquisition prioritizes greater accuracy but may take longer to complete. Actual accuracy depends on the device and location conditions.
Need Help?
If you're experiencing missing GPS coordinates or need help understanding an employee's GPS error information, contact the SimplySub support team for assistance.