Industry Spotlight

Simple Jobsite Management for Electrical Contractors

Electrical crews require accurate timecards, clean job notes, and reliable documentation. SimplySub keeps your team synced and every circuit, fixture, and panel tracked from rough in to final.

$49/month, unlimited jobs and users Built for subcontractors 100 day money back guarantee
See your electrical jobs at a glance
  • Track crew hours by job, floor, or area in a few taps.
  • Log daily progress on rough in, trim, panels, and device installs.
  • Record materials like wire, devices, breakers, fixtures, and gear.
  • Capture photos before cover plates go on so hidden work is documented.
Built for new construction, TI, and service electrical work
Watch the overview

See SimplySub in action for electrical jobs

A quick 2-minute walkthrough showing how crews track time, loads, and equipment without slowing down the work.

Press play to watch the demo

Electrical work is complex and detail heavy

Electrical crews balance layouts, rough in, inspections, changes from the GC, and emergency service calls. When time, materials, and notes live on paper or in scattered texts, it is hard to protect margins and keep everyone aligned.

  • Paper timecards and tickets that slow down billing and payroll.
  • Device counts, circuit details, and panel notes only in a foreman’s notebook or memory.
  • Material usage not clearly tied to jobs which hurts job costing and ordering.
  • Limited photos when owners, inspectors, or GCs question what is in the walls or above ceilings.

SimplySub keeps your electrical jobs organized in real time

SimplySub gives electrical contractors a simple way to track who worked where, what got installed, and what materials were used, then syncs it back to the office so everyone sees the same things.

  • Mobile friendly timecards your crews can complete on site in seconds.
  • Track progress by floor, unit, area, or system so updates match how you build.
  • Log wire pulls, device counts, panels, and fixtures tied to each job.
  • Job photos and notes that support inspections, pay apps, and punch lists.

How electrical crews use SimplySub every day

From layout and rough in to trim and service calls, SimplySub keeps your field teams and office synced. No heavy software, just clear tools that match the way you already run your electrical jobs.

Track crew time by job and area

Foremen log hours by job, floor, unit, or area so you know how much labor goes into rough in, trim, service, and punch items.

Log daily electrical progress

Record what was completed each day, such as device installs, panel work, terminations, and rough in in specific areas or units.

Track materials and gear

Log wire, conduit, devices, panels, breakers, fixtures, and special gear used on each job so you can see real material usage and costs.

Capture critical install photos

Take photos of rough in, panels, junction boxes, and device locations before walls and ceilings are closed, so you have proof and reference later.

Keep inspector and GC notes in one place

Track inspection results, corrections, RFIs, and GC instructions in one hub instead of across calls and text threads.

Give owners and office staff clarity

See which areas are complete, which are in progress, and where crews spent their time, so scheduling, billing, and planning are based on real data not guesses.

What electrical contractors get with SimplySub

SimplySub is built for contractors in the field, not heavy GC platforms. You get the core tools that matter for electrical work without extra clutter or per user fees.

Cleaner job and area costing

See labor, materials, and progress by job, floor, or unit so you know which projects, phases, or customers are profitable.

Faster payroll and billing

Organized time and notes make it easier to invoice, support pay apps, and run payroll without chasing missing tickets.

Better communication with GCs and owners

Share clear records of work performed, materials used, and photos when questions come up about progress or quality.

Less stress for owners

Know what happened on every electrical job each day so you can make confident decisions about staffing, schedules, and bids.

All of this is included in one simple plan, unlimited jobs, unlimited users, built specifically for contractors like you.

Perfect fit for electrical contractors who
  • Run multiple crews across residential, commercial, or service work.
  • Want simple, mobile ready tools their crews will actually use in the field.
  • Need better documentation for inspections, RFIs, and change requests.
  • Do not want to pay per user or wrestle with slow, GC focused platforms.
View Pricing for SimplySub

One simple plan, unlimited users, unlimited jobs, free support, and free training.

Electrical contractors, your questions answered

A quick FAQ for electrical companies considering SimplySub as their jobsite management software.

SimplySub is built specifically for subcontractors and field teams, including electrical contractors. It focuses on timecards, production, materials, notes, and photos instead of the heavy, GC centered features in large project management tools.

Yes. Crews and foremen can log hours, record what was completed, add notes, and capture photos directly from their phones or tablets. Everything is tied to the correct job, area, or phase so the office always has accurate, real time information.

SimplySub organizes labor, materials, and daily activity by job or area so you can see how much work was completed and what it cost. This makes it easier to invoice accurately, support pay applications, and understand which projects or accounts are most profitable.

SimplySub is designed for field crews with big buttons, clean screens, and fast workflows. Most teams can be trained in a few minutes. They pick the job or area, log time, add notes, and upload photos without fighting through complicated menus or slow screens.

SimplySub uses one simple plan, $49 monthly or $475 annually, with unlimited jobs, unlimited users, free support, and free training. There are no long term contracts and you can cancel anytime inside the app. You are also covered by a 100 day money back guarantee so you can see how it fits your electrical business without risk.

Compare SimplySub to other tools by Electrical Contractors

If you’re switching from another platform, these quick comparisons are written specifically for electrical contractors workflows, focusing on how each tool handles jobsite tracking, crew time, photos, materials, and daily reporting in real-world operations.

Ready to organize your electrical jobs with SimplySub?

Start a free trial, invite your crews, and run SimplySub on real jobs. If it does not make your days easier inside the first 100 days, you get your money back, no questions asked.