Start with more than 800 ready-to-use toolbox talks already included, collect signatures and attendance proof, translate your own talks into other languages with a click, and keep employee certifications and credentials organized without building a complicated training program.
Built for real crews, not LMS administrators.
A short walkthrough is being recorded. This section is already in place so the final video, thumbnail, and Product Tour link can be dropped in without changing the page layout.
Instead of paper sign-in sheets, scattered certification cards, and spreadsheets full of expiration dates, SimplySub keeps training activity and employee credentials connected to the people who actually did the work.
Start with a built-in library of more than 800 toolbox talks, with no need to write your own before you can get started.
Take an existing English talk and quickly create additional language versions with built-in AI-assisted translation.
A growing number of SimplySub safety talks include ready-to-watch English and Spanish videos out of the box.
Plan a talk ahead of time or start one on the spot. Pick the topic, select attendees, capture proof, record the location, and complete the session without forcing your team through an oversized learning platform.
Large, touch-friendly screens make talks easy to run from the truck, trailer, or jobsite.
A session QR code gives attendees a simple no-login way to review the snapshotted topic.
Completed training keeps the topic snapshot and attendance proof together for later review.
Credential dates help the office see what is expired and what is coming due.
SimplySub includes more than 800 ready-to-use toolbox talks out of the box. Use them as-is, copy and customize them for your company, or create your own topics whenever you need something specific.
Start training immediately with a large built-in safety talk library instead of spending weeks creating content first.
Take an English company talk and create additional language versions quickly with AI-assisted translation built into the topic workflow.
A growing number of safety talks include both English and Spanish video versions so crews can review the same topic in the language that fits them best.
Cleaner proof. Faster talks. Less chasing paperwork when someone asks for the record later.
Pick the topic, attendees, and location without turning a five-minute safety talk into a twenty-minute software task.
Keep each attendee tied to the session, their proof, and the exact topic version they reviewed.
Completed sessions retain a snapshot of the training content so the historical record does not change later.
Track credential type, number, issuer, dates, notes, status, and supporting documents in one employee record.
Review training by employee, topic, presenter, date, location, proof status, and related records.
Generate completed-session and training-history PDFs from the records your team already captured.
Some employee qualifications come from a toolbox talk. Others come from a card, license, certificate, or outside course. SimplySub keeps both sides visible on the employee record.
See it in a demoKeep credentials and training history where they make the most sense: with the employee.
Attach cards, certificates, scans, photos, and other credential documentation directly to the record.
Record when a credential was issued and when it expires so renewal dates are easier to manage.
Quickly separate expired credentials from those approaching expiration instead of sorting a spreadsheet by hand.
The point is not to create more training administration. It is to make the training you already do easier to document.
Pull up the topic, select the crew, review it together, collect employee signatures electronically with a swipe of a finger, and complete the record before everyone gets moving.
Create it as Pending for a future date, assign the presenter and topic, then start it when the crew is ready.
Review the credential, expiration date, and supporting file from the employee record instead of searching through a folder.
Find the completed session, attendance proof, topic snapshot, location details, and PDF without rebuilding the record from memory.
Translate your own English talks into additional languages with a click, or use one of the growing number of SimplySub talks that already includes English and Spanish video options.
Straight answers without turning safety training into a software project.
Run the talk, collect the proof, and keep employee credentials organized without adding another oversized system to your business.
Built to support your crew, not slow them down.