Concrete Delivery Checklist

Use this concrete delivery checklist to verify mix details, delivery timing, site access, quantities, and placement readiness before concrete arrives.

This Checklist is 100% Free

Print it, copy it, bookmark it, or check items off right on this page. No signup required.

Concrete Delivery Checklist

Concrete Delivery Checklist

Quick Summary

A concrete delivery checklist helps crews prepare for a successful concrete pour by confirming mix requirements, delivery logistics, site access, and placement readiness. A missed detail can lead to delays, wasted material, or quality issues. This checklist is useful for concrete contractors, foremen, project managers, and crew leaders coordinating ready-mix deliveries.

When to Use This Checklist

  • Before scheduling a concrete delivery.
  • The day before a concrete pour.
  • Prior to truck arrival on site.
  • When coordinating multiple concrete loads.
  • Before pump truck operations.
  • For slab, footing, curb, driveway, and flatwork pours.
  • When verifying delivery tickets and quantities.

Before You Start

  • Confirm pour date and delivery schedule.
  • Verify concrete mix design requirements.
  • Confirm total yardage and order quantities.
  • Review weather forecast and site conditions.
  • Verify forms, reinforcement, and prep work are complete.
  • Confirm adequate crew size for placement and finishing.
  • Review supplier contact information and dispatch procedures.

Safety Checks

  • Verify truck access routes are clear and stable.
  • Identify overhead and underground hazards near delivery areas.
  • Establish safe traffic flow around delivery vehicles.
  • Verify pump truck setup areas are suitable if used.
  • Confirm washout locations are identified.
  • Keep unauthorized personnel away from delivery and placement areas.

Tools, Equipment, and Materials

  • Concrete order confirmation.
  • Approved mix design information.
  • Delivery schedule and dispatch contacts.
  • Placement and finishing tools.
  • Pump truck or placement equipment if required.
  • Washout containment materials.
  • Delivery ticket review forms or project records.

Concrete Delivery Checklist

  • Confirm delivery date and arrival time.
  • Verify project address and truck access instructions.
  • Confirm ordered concrete quantity.
  • Verify specified concrete mix requirements.
  • Confirm required additives or special mix components.
  • Verify forms are complete and ready for placement.
  • Verify reinforcement and embedded items are installed.
  • Confirm subgrade or base preparation is complete.
  • Verify crew members are on site and ready.
  • Confirm finishing tools and equipment are available.
  • Verify pump truck setup if required.
  • Inspect access routes before truck arrival.
  • Review delivery tickets upon arrival.
  • Verify delivered mix matches the order.
  • Document delivery times and load information.
  • Coordinate placement sequence and truck staging.
  • Confirm washout procedures before trucks leave the site.

Documentation Needed

  • Concrete order confirmation.
  • Approved mix design records.
  • Delivery tickets for each load.
  • Placement and pour logs.
  • Weather records if tracked.
  • Supplier communication records.
  • Project photos before and during placement.

Common Mistakes to Avoid

  • Ordering incorrect concrete quantities.
  • Failing to verify mix specifications before placement.
  • Not preparing access routes for delivery trucks.
  • Starting deliveries before forms and reinforcement are ready.
  • Failing to review delivery tickets.
  • Not planning truck staging or washout locations.

End-of-Day / Final Review

  • All deliveries were received and documented.
  • Delivery tickets have been collected and filed.
  • Concrete quantities matched project requirements.
  • Washout and cleanup activities were completed.
  • Supplier communications have been documented.
  • The pour is complete and project records have been updated.