SimplySub’s route history feature gives subcontractors a clear way to review GPS activity for a vehicle over a selected period of time. Instead of only seeing where a vehicle is right now, you can look back at where it started, where it traveled, and where it finished.
What this Feature Spotlight covers
This video walks through how route history works inside SimplySub GPS tracking.
- Open route history from a selected vehicle in GPS tracking
- View recent vehicle activity on the map
- See the starting point, route points, and ending location
- Click into individual route points for more detail
- Review details like speed, heading, and odometer reading
- Adjust the date and time range for the route history view
- Zoom, pan, and review the map to better understand the route
Why it matters
For subcontractors, vehicle activity can be an important part of daily operations. Route history can help confirm where a vehicle traveled, review when it was at a certain location, and better understand how field activity lines up with jobsite work.
This can be useful for checking travel routes, verifying site visits, reviewing timing, or answering questions about where a vehicle was during a specific window.
Built to stay simple
SimplySub keeps route history easy to use. Select a vehicle, open route history, choose the time range you want to review, and inspect the activity directly on the map.
The goal is to give subcontractors helpful GPS visibility without making the workflow difficult. Route history stays focused on the practical details your team needs to understand vehicle movement and jobsite travel.